Bunn TB3 Installation And Operating Manual

Manual is about: TB3 TB3-LP OPERATING & SERVICE MANUAL

Summary of TB3

  • Page 1

    Tb3 series including: tb3; tb3-lp; tb3q; tb3q-lp starting with serial number: tu00020000 installation & operating manual bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the operating ma...

  • Page 2

    Page 2 bunn-o-matic commercial product warranty bunn-o-matic corp. (“bunn”) warrants equipment manufactured by it as follows: 1) all equipment other than as specified below: 2 years parts and 1 year labor. 2) electronic circuit and/or control boards: parts and labor for 3 years. 3) compressors on re...

  • Page 3

    Page 3 warning ! Fill water tank before turning - on - thermostat or connecting appliance to power source. Use only on a properly protected circuit capable of the rated load. Electrically ground the chassis. Follow national/local electrical codes. Do not use near combustibles. Failure to comply risk...

  • Page 4

    Page 4 electrical requirements caution - the brewer must be disconnected from the power source until specified in initial set-up. 120v model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 hz. "a" model brewers require 2-wire, grounded service rated 230 volts ac...

  • Page 5

    Page 5 120v models these brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kpa) from a ½˝ or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than...

  • Page 6

    Page 6 ° ° ° ° adjusting brew volumes note: check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place, prior to setting or modifying batch sizes. 1. Modifying batch sizes. To modify a batch volume, first check that the set/lock switch is in...

  • Page 7

    Page 7 initial set-up (tb3q/tb3q-lp only) caution - the brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions. 1. Remove the top lid from the brewer. 2. Rotate the control thermostat knob fully counterclockwise to the "off" positio...

  • Page 8

    Page 8 initial set-up (tb3/tb3-lp only) caution - the brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions. 1. Remove the top lid from the brewer. 2. Rotate the control thermostat knob fully counterclockwise to the "off" position ...

  • Page 9

    Page 9 auto sweetener set-up caution - the brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions. 1. Remove the top lid and both rear panels. 2. Make sure the brewer water supply is off. 3. Connect sweetener hose from the bag in a ...

  • Page 10

    Page 10 41465 082208 operating controls a. On/off switch on - placing the switch in the left position allows the start switch to activate a timed brew cycle for three gallons of tea. Off - placing the switch in the right position stops the brew cycle. Stopping a brew cycle after it has been started ...

  • Page 11

    Page 11 41465 082208 cleaning caution - clean and sanitize your iced tea brewer daily 1. Remove and thoroughly clean the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel. 2. Place the on/off switch in the "off" position. Remove and t...