CABAC UPS1000DV3 User Manual - Installation Instructions
Customer Care Australia P: 133 122 F: 1300 303 310 E: sales@cabac.com.au W: cabac.com.au
A: 8 Distribution Pl, Seven Hills NSW 2147
Customer Care New Zealand P: 8 0077 6969 F: 8 0088 6969 E: sales@cabac.co.nz W: cabac.co.nz
10
10 of 21
Installation Instructions
1.
Inspection
Inspect the UPS upon receipt. The packaging is recyclable. Save it for reuse or
dispose of it properly. Ensure the UPS is physically undamaged due to transit.
2.
Placement
Install the UPS in a protected area with adequate airflow, and away from direct
sunlight and excessive dust. Do not operate the UPS where the temperature and
humidity is outside the specified limits in the Specifications Table.
3.
Connect to Mains Power
Connect the AC input power cord to a socket outlet to power up the UPS.
The battery in the UPS will lose some charge during shipping and storage. It will
recharge completely after approximately 8 hours of normal operation. Do not
expect full battery run time during this initial recharge period.
4.
Connect the loads
Plug the loads into the output sockets on the rear of the UPS. Ensure the UPS is
sized correctly so that the UPS is not run at full load constantly.
Caution: NDO NOT connect a laser printer or plotter to the UPS with other
computer equipment. A laser printer or plotter periodically draws significantly
more power than when idle, and may overload the UPS.