Ecoplus SWBH 26 Installation Instructions Manual - page 15
Installation instructions
1. Unit installation
1).Installation location
Host unit
²Should be installed in a larger & well-ventilated place.
²Installation location should ensure unhindered access outlet (inlet & outlet shown as
below).
²Install gutter or set up positions near the outfall, to facilitate the drainage.
²The installation base or bracket should be steady, to ensure the smooth operation of
running units.
²Make sure the unit is vertical after installation, and no incline.
²Make sure not to install the host unit in the any conditioner of pollution, corrosive gases,
sun and fallen leaves, etc.
²Installation location must not next to place of incendive , easy-explosion and fire .
²Installation must pay attention to the distance between the barriers shown in below
picture (pay attention to arrow direction).
Water tank
²Water tanks should be placed where ambient temperature is above 0
℃
.
²Can be installed outdoors or the top of the building (based on the size of water tanks and
the load-bearing capacity of the building and so on).
²Do not install water tanks in the pollution, corrosive gases place.
2).Unit installation
²Units base can be installed as cement concrete structures, steel brackets can also be used,
add the shockproof rubber pads , make the base surface flat.
²Units can be designed based on the working performance.
(See table of technical performance parameters)
²Unit should have drain or drainage inlets.
²Normally required to install in the place where setted cement concrete base.
Above 1000mm
2000mm above the top
Air inlet
Air outlet
Heat pump
Air inlet
Above 1000mm
Ⅸ
.Installation instructions
Water heater
13