ECOPURE EPWHCW Installation and operation manual - page 12
12
Installation Instructions
FIG. 11
SINGLE BYPASS VALVE
Pull handle
OUT for normal
operation
Push handle IN
for BYPASS
INSTALL VALVE DRAIN HOSE
1. Measure, cut to needed length and connect the 3/8"
drain line (provided) to the Central Water Filtration
System valve drain fitting (See Figure 11). Use a
hose clamp to hold the hose in place.
NOTE: If codes require a rigid drain line see “Valve
Drain requirements" section.
2. Run the drain hose or copper tubing to the floor drain.
Secure drain hose. This will prevent the drain line
from “whipping'' during Clean Rinse cycles. See “Air
Gap Requirements" section.
TEST FOR LEAKS
1. Make sure the single bypass valve (or 3 valve bypass,
if installed) is in the bypass position, with the handle
pushed in (See Figure 11).
2. Fully open the main water supply valve.
3. Briefly open a faucet in the house to refill the plumb-
ing with water.
4. Place the bypass valve(s) in normal operation posi-
tion, with the handle pulled out (See Figure 11).
5. Check for leaks at all the plumbing connections you
made.
IMPORTANT: Start up procedure must be run prior to
using any filtered water. Follow the
instructions below and on Page 13.
TURN ON THE CENTRAL WATER FILTRA-
TION SYSTEM
During installation, the Central Water Filtration System
wiring may be moved or jostled from place. Check to be
sure all leadwire connectors are secure on the back of
the electronic board (see Figure 27 on Page 22) and be
sure all wiring is away from the valve gear and motor
area, which rotates during Clean Rinse cycles.
1. Plug the Central Water Filtration System’s transformer
into an electrical outlet that is not controlled by a
switch.
2. In the display, the words “PRESENT TIME” appear
and 12:00 PM begins to flash. Set the clock accord-
ing to the “Set Time of Day” section on Page 14.
3. Run the start up procedure, as detailed on Page 13.
Drain Line
Connection