Fadini FIBO 300 Installation Manual - page 3
3
PIC. 3
FITTING THE BASE PLATE
- The first operation involves preparing a cable containment well near the installation, connected to the FIBO 300 base plate by an
appropriate conduit for electrical connections (Pic. 3).
- In order to fit the base plate “G” it is necessary to firstly remove the protection cover “H” by unscrewing the four fixing screws “A”
from the bottom of the automation sides (Pic. 2).
- The base plate “G” should be fixed into place with M16 plugs “T”, which must be firmly anchored in the flooring, respecting the base
plate hole centre distances and making sure that the automation base plate “G” is perfectly levelled by using spirit levels (Pic. 3).
PROCEDURE FOR INSERTING AND FIXING THE FOUNDATION PLUGS “T”
1
TIGHTENING THE PLUGS:
ONCE THE PLUG PROTRUSION
HAS BEEN ESTABLISHED,
TIGHTEN THE NUT TO THE
FLOOR IN ORDER TO FIRMLY
FIX THE PLUG IN THE HOLE,
THEN UNSCREW AND REMOVE
THE NUT
INSERT THE PLUGS IN THE
HOLES LEAVING A PART
PROTRUDING FROM THE FLOOR
E Q U I V A L E N T T O T H E
THICKNESS OF THE BASE
PLATE AND FIXTURE NUT,
C O N S I D E R I N G T H E
PROTRUSION OF THE PLUG
DURING TIGHTENING
BORE 4 HOLES IN KEEPING
WITH THE DIAMETER OF THE
PLUGS AND THE PASSAGE
2
3
70 mm
290 mm
350 mm
Ø16
600 mm
500 mm
500 mm
290 mm
350 mm
“T”
M16 FOUNDATION PLUGS
TO BE FIXED TO THE
FLOOR IN ORDER
TO ANCHOR THE
BASE PLATE
FOUNDATION
PLINTH IN
CONCRETE
ELECTRIC CABLE CONTAINMENT WELL
40x40 cm TO BE INSTALLED IN THE
IMMEDIATE VICINITY OF THE FIBO 300
CONNECTION
CONDUIT Ø 40
FIBO 300 WITHOUT COVER
ELECTRIC
MOTOR
LIMIT
SWITCH
Ø18 HOLES FOR
FIXING THE
M16 PLUGS
“G” BASE PLATE
HOLE FOR
ELECTRIC CABLE
PASSAGE
POSITION THE
BASE PLATE USING
SPIRIT LEVELS