Fadini Hindi 880 Installation Manual

Other manuals for Hindi 880: Instruction Manual
Manual is about: Oil-hydraulic actuator to operate swinging gates up to 4 meters

Summary of Hindi 880

  • Page 1

    N.W. With all the electro-hydraulic operators, once installed, you need to set the safety pressure valves to meet the gate pushing power/anti-crush requirements. The valve “open” must be set to get higher pressure than “close”. The electric cable is factory-set and must be left free. The encoding re...

  • Page 2

    11 2 earth connection live (red) common (blue) rear fixing bracket oil reservoir base binding posts motor end p art st a tor rotor motor end p art electric cable electric motor oil reservoir assembly valve body fadini oil a 15 by agip oil-hydraulic lobe pump bidirectional v a lve block pressure v a ...

  • Page 3

    3 10 special applications hindi 880 this page specifically refers to the special operators in the hindi 880 range, ie. Drwg. No. 1990 - 150 mm, drwg. No. 0987 - 400 mm stroke and drwg. No. 2552 braking in open/close cycles. The detailed installation instructions that are contained in this manual app...

  • Page 4

    9 4 keep to the following to achieve a perfectly working system. Hindi 880, strong, functional and easy to install, is designed to be fitted to swinging gates by means of two plates, one is to be fixed to the gate and the other one to the gate post, pillar or brick pier. Check parts as in picture no...

  • Page 5

    5 8 before definitely fixing the front fixing plate to the gate, carry out some performance tests, the ball bearing joint still fully screwed in. Let the shaft come out to its full extension so to check if the above plate is in the correct position and fix it by welding. See picture 5. Where brick p...

  • Page 6

    7 6 make sure that the distances a and b are a 130 mm and b 130 mm, the centre of the gate hinge and the centre of the rear bracket of the operator to be referred to respectively. Distance d is never to be varied and must be equal to 80 mm from the centre of the ball bearing joint to the gate surfac...

  • Page 7

    7 6 make sure that the distances a and b are a 130 mm and b 130 mm, the centre of the gate hinge and the centre of the rear bracket of the operator to be referred to respectively. Distance d is never to be varied and must be equal to 80 mm from the centre of the ball bearing joint to the gate surfac...

  • Page 8

    5 8 before definitely fixing the front fixing plate to the gate, carry out some performance tests, the ball bearing joint still fully screwed in. Let the shaft come out to its full extension so to check if the above plate is in the correct position and fix it by welding. See picture 5. Where brick p...

  • Page 9

    9 4 keep to the following to achieve a perfectly working system. Hindi 880, strong, functional and easy to install, is designed to be fitted to swinging gates by means of two plates, one is to be fixed to the gate and the other one to the gate post, pillar or brick pier. Check parts as in picture no...

  • Page 10

    3 10 special applications hindi 880 this page specifically refers to the special operators in the hindi 880 range, ie. Drwg. No. 1990 - 150 mm, drwg. No. 0987 - 400 mm stroke and drwg. No. 2552 braking in open/close cycles. The detailed installation instructions that are contained in this manual app...

  • Page 11

    11 2 earth connection live (red) common (blue) rear fixing bracket oil reservoir base binding posts motor end p art st a tor rotor motor end p art electric cable electric motor oil reservoir assembly valve body fadini oil a 15 by agip oil-hydraulic lobe pump bidirectional v a lve block pressure v a ...

  • Page 12

    N.W. With all the electro-hydraulic operators, once installed, you need to set the safety pressure valves to meet the gate pushing power/anti-crush requirements. The valve “open” must be set to get higher pressure than “close”. The electric cable is factory-set and must be left free. The encoding re...