Gallagher S20 Instructions Manual - Product Specifications
11
IMPORTANT BATTERY INFORMATION
Recharging the baƩ ery
Switch the energizer off . Place in sunlight for 3 days
with the ba ery connected OR remove the ba ery
from the energizer and charge the ba ery for 24
hours with a 6 V 1.2 A ba ery charger.
Storing the energizer
Switch the energizer off . Store in a well lit area so
solar panel keeps ba ery charged. Recharge ba ery
before and a er storage.
Maintenance free baƩ ery
The ba ery must not be opened and does not
require maintenance.
BaƩ ery replacement
Use only 6 V 4 Ah sealed, valve regulated (VRLA)
ba eries.
Removing the baƩ ery
Switch the energizer off before removing the ba ery.
Disposing the energizer
The ba ery must be removed from the energizer
before the energizer is disposed.
Disposing the baƩ ery
Lead acid ba eries must be disposed of safely
according to local regula ons.
PRODUCT SPECIFICATIONS
Ba ery
6 V 4 Ah sealed lead acid (2M1847)
Current draw
28 mA
Stored energy
0.2 J
Output energy
0.16 J
Output voltage (no load)
8 kV