HAGS nexus altitude nxa-03s Installation Instructions Manual - page 33
NEXUS ALTITUDE NXA-03S
Appendix A Page 33
xxiii) Attach the Gantry Panels (item 20) to each of the LH & RH Gantry Frames (item 2 & 3) using 7 off M10 x 25
Resistorx bolts (item 37), M10 Tee Nuts (item 42), M12 Shockproof Washers (item 46) and M10 Washers
(item 45). Fully tighten. (STEP 10).
xxiv)Attach the Gantry Panel (item 19) to the RH Gantry Slide Entry Frame (item 4) using 3 off M10 x 25 Resistorx
bolts (item 37), M10 Tee Nuts (item 42), M12 Shockproof Washers (item 46) and M10 Washers (item 45).
Fully tighten. (STEP 10).
xxv) Attach Tower Eko-grip Deck (item 18) to Tower Deck Frame (item 5) using 12 off M10 x 35 Resistorx bolts
(item 35) and M10 Washers (item 45). Fully tighten. (STEP 11).
xxvi)Attach 5 off Climbing Grips (item 28) to outside face of Vertical Climb Wall Top & Bottom (item 23 & 24) using
2 off M10 x 35 Resistorx bolts (item 35), M10 Tee Nuts (item 42), M12 Shockproof Washers (item 46) and M10
Shockproof Washers (item 47). Fully tighten to 20-25Nm. (STEP 12).
xxvii)Attach 1 off Thorn Climbing Grip (item 27) to Post (item 1) at position shown using 2 off M10 x 65 Resistorx
bolts (item 33) and M10 Shockproof Washers (item 47). Fully tighten to 20-25Nm. (STEP 12).
xxviii)Attach 5 off Climbing Grips (item 28) to outside face of Angled Climb Wall Top & Bottom (item 21 & 22) using
2 off M10 x 35 Resistorx bolts (item 35), M10 Tee Nuts (item 42), M12 Shockproof Washers (item 46) and M10
Shockproof Washers (item 47). Fully tighten to 20-25Nm. (STEP 13).
xxix)Attach 7 off Climbing Grips (item 29) to both sides of Tower Thorn Climber 2100 (item 8) as shown using 1 off
M10 x 65 Resistorx bolts (item 33) and M10 Shockproof Washer (item 47). Fully tighten to 20-25Nm.
(STEP 13).
xxx) In all fixing positions on the steel work that has not been utilised, the protective plug should be removed and
the permanent black plastic plug (item 48) inserted and knocked home with a soft hammer. (STEP 14).
5
POST INSTALLATION INSPECTION
CHECK
CHECK
1
The unit is installed at the correct height.
2
All fixings are tightened to the correct torque and have no protruding sharp edges.
3
Paint work and polyethylene covers are not damaged (Any making good should be carried out
using the procedure in the Inspection and Maintenance instructions).
4
Ensure all plastic plugs are correctly fitted.
5
Concrete foundations are secure.
6
Concrete has a water shed away from leg.
7
Adequate provision of Impact Absorbing Surfacing with no obstructions or other hazards
within the equipments minimum space.
8
Site is clear of all tools and rubbish.
9
Remove any warning signs.