1.Installation preparation
Before installation and maintenance,unit changeover switch should lock in power off state,avoiding touch electricity or running
part cause human hurt or death. For ensuring that installation is correct,followed factors should be considered:
(1)all power supply must be accordant with electric parameter on unit nameplate.
(2)if exterior of unit need instal accessory,there should reserve excess space.
(3)All duct must make heat insulation safeguard to acoid heat or cool capacity loss.
2.Transportation,Suspension
he air conditioner is generally in complete unit.During transportation and suspension,it needs to handle with care to avoid damage
to the panel,which may affect the performance and precision of the unit.
Suspension:
before unit suspension,make sure the center of gravity to garantee suspension safety,consider of interior parts collocation,unit
weight is not equable,unit can be transported using fork vehicle.when suspension,adopt gasket board to aviod carton damaged.Try
to suspend unit,ensuring if it is stable.
there should isolate unit and buiding when unit suspended.Usual
adopt spring or rubber cushion etc. on site.
Before instal suspend girder,followed items need be checked:
1)Obligate space can supply reasonable air organize and enough space(necessary installation space and intervals please refer to
figure 1 )
2)before installation,ensuring there has proper space to ensure every coil's installation and electric wiring.
3)check supporter's structure,ensuring that there has enough intensity to support unit weight.
4)For farther limit about vibration pass when extreme applition,can adopt connection of proper vibration isolater and with free
duct connector
Indoor unit installation instruction
Installation procedures