Haier ESA3156 - ANNEXE 221 User Manual - page 18
16
Install top rail with four 13/32" screws.
Slide left-hand curtain assembly into
left end of top and bottom rails. Repeat
for right-hand curtain assembly. Fasten
curtain retainer strips to the sides of
the outer case with six 13/32" screws.
Measure the width between the
window moldings to ensure the Instant
Mount will fit the window frame.
Instant Mount models are designed
for windows wide (for details see
page 15)
ASSEMBLE
CURTAINS/TOP
RAIL
2
PREPARE
WINDOW FOR
INSTALLATION
Inspect window track, sash, and sill
for i
ts ability to supportthe weight of
air conditioner.
s(not
3
Mobile home window installation
Add wood strip (at least 1 1/2" wide)
along entire width of window sill.
Thicknessof wood strip should match
height of front lip on window frame.
Fastenwood strip to sill with a
minimum of three countersunk wood
screws (not supplied with kit). This
provides a smooth surface for
mounting air conditioner.
Storm window installation
I
f storm window frame does not allow
adequate clearance below sill (1/2"
required), remove storm window
frame or create clearance by adding a
wood strip (at least 1 1/2" wide) along
entire wid th of sill. Fastenwood strip
to sill with at least three countersunk
wood screws (not supplied with kit).
This provides a smooth surface for
mounting air conditioner.
S
I LL
W ood
Str ip
1/2"
Min imum
O
U
T
D
O
O
R
St orm Wi ndo w
Fram e
1 1/2"
Min imum
I
N
D
O
O
R
1 1/ 2"
Minimum
W ood
St rip
I
N
D
O
O
R
O
U
T
D
O
O
R
Window
Frame
Mus tbe a mini mum
o
f 1/2"
t
o c
l ear
botto m rail
on unit