IBM 2809 Instruction - page 15
__ 4.
Look at the Function/Data display on the control panel. Does a
B N
appear in the Function/Data display?
Yes
No
↓
Do the following:
a.
Press the Up or Down select push button until
02
appears in
the Function/Data display.
b.
Press the Enter push button on the control panel.
c.
Press the Up or Down select push button until
B N
appears in
the Function/Data display.
d.
Press the Enter push button on the control panel.
e.
Press the Up or Down select push button until
01
appears in
the Function/Data display.
f.
Press the Enter push button on the control panel.
g.
Go to step 5.
__ 5.
Power on the workstation or PC that is your console.
__ 6.
Press the system unit power-on button. The power-on light will appear.
Note:
The system takes approximately 6 to 10 minutes to power on and
complete an IPL.
__ 7.
Sign on the system unit. Ensure that you have service tools authority.
__ 8.
Do the following to verify your adapter card configuration:
a.
On an AS/400 command line, type:
STRSST
Press the Enter key.
b.
When the Start a Service Tools menu appears, select the
Start a service
tool
option.
Press the Enter key.
c.
When the Start a Service Tool menu appears, select the
Hardware service
manager
option.
Press the Enter key.
d.
When the Hardware Service Manger menu appears, select the
Packaging
hardware resources (system, frames, cards...)
option.
Press the Enter key.
e.
When the Packaging Hardware Resources menu appears, type a
9
in
front of the
System Unit
.
Press the Enter key.
Verify the adapter card you just installed appears in the card position it
was installed.
If the adapter card is not listed, ensure that the card is properly installed.
f.
Did you move an adapter card?
Installation Instructions
9