Jasic Cut 160 Operator's Manual - Installation
Installation
5
Unpacking
Check the packaging for any signs of damage.
Carefully remove the machine and retain the packaging until
the installation is complete.
Location
The machine should be located in a suitable position and
environment. Care should be taken to avoid moisture, dust,
steam, oil or corrosive gases
Place on a secure level surface and ensure that there is
adequate clearance around the machine (at least 20cm) to
ensure natural airflow.
Input connection
Before connecting the machine you should ensure that the
correct supply is available. Details of the machine
requirements can be found on the data plate of the machine
or in the technical parameters shown in the manual.
The equipment should be connected by a suitably qualified
competent person. Always ensure the equipment has a
proper grounding.
Never connect the machine to the mains supply with the
panels removed.
Connection of work cable
Insert the quick plug on the work cable into the quick socket
at the bottom of the front panel of the machine, and tighten
it clockwise. Clamp the workpiece with the work clamp at
the other end of the earth cable.
Connection of cutting torch
Connect the central connection plug on the cutting torch to
the central connection socket of the power supply, and
tighten It clockwise to avoid gas leakage.
Connection of the air supply
The unit should be connected to a suitable, clean and dry air
supply. If there is oil or water in the air a suitable three stage
filter should be connected.
If the quality of air is poor, the cutting speed will decrease,
the cutting quality will lower, the cutting thickness will
reduce, and the service life of wearing parts will be
shortened. In order to obtain the optimal performance, the
maximum particle size of air should be 0.1μm, the maximum
concentration of air should be 0.1mg/m3, the maximum dew
point of air should be -40℃, the maximum oil concentration
should be 0.1mg/m3.
9