JAYLINE IS550 Installation & Operation Instructions - page 2
January 2015
page 2
www.jayline.co.nz
Congratulations on the purchase of your Jayline wood fire.
Please read this installation and operation manual carefully.
The installation of this fire must comply with the Installation Standard
AS/NZS 2918:2001 as well as any additional local requirements.
Please ensure you have all relevant permits prior to installation.
Keep this booklet as a reference guide.
InstallatIon of your JaylIne Wood fIre
Jayline recommends you use a suitably qualified installation technician to install your fire. Your dealer
or heating specialist will be able to help with recommendations as well as advise on permits/consents
required for the installation in your area.
Please follow carefully all dimensions and recommendations provided on the individual specification
sheet for your model of heater as these dimensions comply with the required New Zealand standard
(AS/NZS 2918:2001).
As safety and emissions performance can be affected by altering the appliance, no modifications are
allowed without the written permission from the manufacturer.
Pre-InstallatIon
Prior to installing your Jayline Insert into a fireplace cavity, it is important that certain clearances and
other requirements are complied with as detailed below:
fIrePlace cavIty
* The chimney must be swept.
* Check for cracks and overall condition. If repairs are necessary, they must be carried out by a
suitably qualified technician.
* Check the cavity dimensions to ensure the insert will fit. It is usually necessary to remove the bricks
from the lower fireplace cavity.
* The base of the fireplace on which the Jayline Insert will rest must be level. If not, it should be
leveled using mortar.
* If a timber or combustible mantle shelf exists above the fireplace opening, it should be a minimum
distance above the top of the floor protector. The minimum distance is 1175mm. If less than the
minimum specified, a deflector or heat shield will be required to be under the mantle shelf.