Jbc TE-QD Manual - page 5
Main menu
1 Reset settings
2 Station Settings
3 Program Settings
4 Counters
5 Program version
Exit
Program Settings
Edit Program
Edit Program 8
1
Programs
2 Edit program
3 Copy program
4 Delete program
Back
Select
Program
Step 4
Time 20
Temp 450
Air 100
º
C
º
C
8
Exit
Counters
1 Station ON hours
0
2 Works hours
0
3 Works cycles 0
Back
Settings
1 Temp unit
Celsius
2 Maximum temp 450
0
C
3 Minimum temp T OFF*
4 Fix temp
400
0
C
5 Temp Adjust
0
0
C
6 Max air
100%
7 Min air
10%
8 Fix air
40%
9 Time to stop 120 sec
10 Stabd/Pedal
Stand
Autostart
OFF
11 Beep
ON
12 Pop up
ON
13 Change PIN
Back
8
9
Menu Screen
Original PIN: 0105
Only perform this operation when the element is cold and the unit is disconnected from the mains.
1. Loosen the screw.
2.Pull the heating element away from the handle.
3. Connect the new heating element, ensuring it is pushed all the way in.
4. Tighten the screw.
Replacing the Heating Element
1. Ensure that the tool is turned off.
2.Use a spanner to unscrew the connecting nut.
3. When attaching the new tube make sure the rib
lines up with the groove on the control unit.
4.Tighten with the spanner.
Changing the TE-TB Precision Heater Hose Set
Precision Heater
Hose Set
Ref. TE-TB
(230 V/120 V/100 V)
Heating Element
Ref. 0012374
(100V - 230V - 120V)
TE Handle
Ref. TE-B
* When selecting Minimum
Temp as “T OFF”, the air blows
at room temperature.
www.jbctools.com
8
9