Kane Hawk5000 Operator's Manual

Summary of Hawk5000

  • Page 1

    Hawk 5000 operator manual kane international limited 1 hawk5000 operators manual kane international limited kane house, swallowfield welwyn garden city hertfordshire al7 1jg tel: +44 (0)1707 375550 fax: +44 (0)1707 393277 stock no 13756 / 8 march 2002 © kane international limited.

  • Page 2: Contents

    Hawk 5000 operator manual kane international limited 2 contents general information ....................................................................................3 requirements.....................................................................................................5 safety ...........

  • Page 3: General Information

    Hawk 5000 operator manual kane international limited 3 general information this is the section, which gives you an introduction to the hawk5000 system and its hardware. It will make the subsequent operation easier to understand if you read through this first. Software operations are separately descr...

  • Page 4

    Hawk 5000 operator manual kane international limited 4 scale setting pulses pulse inputs need to be defined as follows: the unit name , scale and offset values for the two pulse inputs. If pulse inputs are not being used, then this section need not be set-up. The scale and offset are implemented as ...

  • Page 5: Safety

    Hawk 5000 operator manual kane international limited 5 range of measurements... Hawk5000 is capable of measuring any or all of the following: current x 3 phases power x 3 phases va x 3 phases total reactive power x 3 phases lagging reactive power x 3 phases pulses x 2 voltage x 1 frequency x 1 requi...

  • Page 6

    Hawk 5000 operator manual kane international limited 6 electromagnetic compatibility the european council directive 89/336/eec requires that electronic equipment does not generate electromagnetic disturbances that exceed defined levels and has an adequate level of immunity to enable it to operate as...

  • Page 7

    Hawk 5000 operator manual kane international limited 7 getting started with the hawk5000 overview the operations required to perform a survey are: a) connect the hawk to a pc and run the commander or hawk reporter professional program. B) enter the set-up section of the program. C) set up the hawk a...

  • Page 8: Starting A Survey

    Hawk 5000 operator manual kane international limited 8 on-site starting a survey assuming that the hawk has previously been set up, and you are now at the site to be surveyed: if you can arrange to have a portable computer with you, the hawk5000 software and a suitable serial lead, this will allow y...

  • Page 9

    Hawk 5000 operator manual kane international limited 9 confirming correct operation 1. The 'logging' light should now flash every few seconds to indicate that the hawk is recording data in memory. 2. Each of the three red lights adjacent to the ct connectors indicates that is the phase, which is als...

  • Page 10

    Hawk 5000 operator manual kane international limited 10 the phaser under normal circumstances, the phaser will not be needed, as the hawk will be able to perform phase allocation on its own. However, in real life, bad power factors , ct clamps on the wrong way round, or on wrong phases, and reversed...

  • Page 11

    Hawk 5000 operator manual kane international limited 11 using pulse input devices the two pulse inputs are designed for connection to devices which have an output signal in the form of a stream of pulses, for example: electricity meters with volt-free contact outputs fluid flow meters each pulse con...

  • Page 12

    Hawk 5000 operator manual kane international limited 12 downloading data a) if the hawk is being taken back to the office, switch off the power to the hawk and disconnect the ct clamps from the cables. B) back at the office, connect the mains cable to the hawk, and switch on. Connect the serial cabl...

  • Page 13: Troubleshooting

    Hawk 5000 operator manual kane international limited 13 troubleshooting hawk5000 program a) the program displays ' logger not found ' for more than a few seconds: is the hawk powered up? Is the hawk connected by the correct serial lead to the pc? Is the hawk connected to the correct serial port on t...

  • Page 14

    Hawk 5000 operator manual kane international limited 14 d) in three phase mode, if two of the ct lights flash, try swapping the ct clamps over. If two of the ct lights are flashing, this may be because the phase rotation is marked wrongly on the cables at that particular site. This can be confirmed ...

  • Page 15: Technical Information

    Hawk 5000 operator manual kane international limited 15 technical information specification amperes notes range 0.4 to 1000 a 2, 5 resolution 0. 1a accuracy 1% 1 volts range 0 to 280 v 4 resolution 0.5 v accuracy 1% 3 pulses range lo: 0 to 25 hz hi: 25 to 20000 hz resolution 1 pulse accuracy 1 pulse...

  • Page 16

    Hawk 5000 operator manual kane international limited 16 working conditions supply voltage (240v model) 180 to 260 v ac (120v model) 90 to 130 v ac (not to exceed +10% of the nominal voltage) supply frequency 40 hz - 65hz max. Power 20 va max. Relative humidity 80% for temperature up to 31 ° c decrea...

  • Page 17

    Hawk 5000 operator manual kane international limited 17 connections looking at the back of the hawk from left to right the connections are: mains power via an iec connector pc serial interface via a 9 pin cannon 'd' type. 2 off pulse input via 6 pin circular din connectors the phaser input 3 off cur...

  • Page 18

    Hawk 5000 operator manual kane international limited 18 ce marking this product has been tested for compliance with the following generic standards: en 50081-1 en 50082-1 and is certified to be compliant specification ec/emc/ki/hawk 5000 details the specific test configuration, performance and condi...

  • Page 19

    Hawk 5000 operator manual kane international limited 19 glossary logging period: the time between storing logged data in memory (e.G. Every 30 minutes). The value stored is the average of all the measurements taken during the last logging period. Measurement period: the time between making a measure...