KANEKA G-SA060 Installation Manual - page 9
G-SA060-002
1. Press a stainless steel nut with a star washer and a 10-32 thread into the
ground holes (marked ‘GR’) on the back of frame.
2. Install a ground lug such as the shown ILSCO GBL-4DBT which is UL
listed. (User-Provided)
3. A screw shall be used to secure a ground lug as described in the illustration.
In this case, the screw threads are not providing the electrical ground contact.
However, the screw needs to provide sufficient torque to ensure that the lug
is mechanically secure.
4. Connect a minimum #10AWG solid conductor, copper, ground wire to the
ground lug.
You will use stainless steel hardware such as bolt, star washer, flat washer
and nut to complete the assembly.
Their specifications are as follows:
#10-32×1’ stainless steel screw, star washer and nut(User-provided)
#10 to 1/4’ DIA stainless steel bolt (User-provided)
6.Maintenance
Under the normal use maintenance is not necessary. The dirt on the surface of the
MODULES will be washed away by rain.
Hex bolt
Nut
Set screw
Wire
Side frame
Wire insert
Star washer
Lug
Flat washer
http://www.wholesalesolar.com/solar-panels.html