La Pavoni professional Instructions For Use Manual

Other manuals for professional: Operating Instructions Manual

Summary of professional

  • Page 1

    Instructions for use first time operation i for first time “out of the box” operation we recommend you clean the inside of your la pavoni machine. Follow the simple procedures below: 1. 2. 3. 4. 5. 6. 7. Fill the boiler (9) with water until the water level reaches the top of the sight glass (5). For...

  • Page 2

    1. 2. 3. 4. 5. 7. 10. 11. 12. 14. Lever safety valve boiler cap steam knob sight knob on - off power switch pressure switch drip basin boiler filter handle steam tube coffee press measuring spoon coffee filters cappuccino automatic attachment / professional model - crome - copper /brass.

  • Page 3

    Tructions for use i please read all instructions before using your la pavoni before your la pavoni machine is plugged in you must complete steps 1 and ! 1. Remove the boiler cap (3) and fill the boiler (9) with water until the water level reaches the top of the sight glass (5) as pictured in diagram...

  • Page 4

    When the machine has reached maximum pressure the pressure gauge (7) will be in the green zone. The la pavoni professional is equipped with an internal thermostat which controls the temperture. When the proper temperature is reached it will be maintained automatically. Your machine is now ready to o...

  • Page 5

    Your la pavoni machine is designed to froth milk ( for cappuccino) in two ways. I making cappuccino with the standard plated arm i a. Start with cold milk, whole or 2% low fat milk work best. You may froth milk in any type of container or cup you wish: stainless steel, ceramic or glass. Fill the cup...

  • Page 6

    Trouble shooting pressure machine to reach temperature green zone in pressure gauge ( 7 ) bleed air from steam tube (12) by opening the steam knob (4). After steam has exited, close steam knob and allow the machine to reach pressure again handle l allow lever (1) to remain raised longer. This will a...

  • Page 7: Technical Precautions

    Technical precautions i 1. Install the machine on a steady, dry base. 2. Do not immerse the machine or power cord in water. 3. This machine develops warm spots (base) and hot spots (boiler 9). Subsequently, it should be kept out of the reach of children. 4. When operating, please take note of the ho...

  • Page 8

    Technical data model: professional size: lenth 11 width 7” height 12” weight: 17 lbs. Boiler capacity: 38 oz. Steam delivery: 10 minuteses power supply: 110 volt hz heating element: 1000 watt available in the following models: pc 16 chrome base pb 16 copper body/brass base parts list drip basin top ...