Lance-Larkin Brew Express BE-104C Install Manual - page 15
12
BREwER INSTALLATION
6. After sheet rock screws are in place, bend tabs to finish securing
rough-in box to wall. See figures 6 and 7. Use pliers (if needed)
to bend/crimp tabs firmly to wall. Gently slide excess water
line back through grommet into wall cavity leaving top of
connector a maximum of 3” above bottom of rough-in box.
Carefully install power panel cover. All electrical wires and
connections MUST be tucked completely inside
POWER PANEL COVER, without exposing bare wiring inside
rough-in box. It is advised you contact a qualified electrician.
Be certain not to damage wires or insulation. See Figure 7.
Installation of Brewer
7. Important, for the BE-104C model (single button), set 2/4 cup volume
selection switch on back of brewer prior to installation of brewer
8. The male quick connector has a built in valve so water can be
turned on prior to connection to coffee maker. Place unit on
a towel or cardboard to protect counter surface. Place
BREW EXPRESS directly in front of rough-in box. Connect
brewer to water supply using quick connectors. (See Quick
Connect Detail). Snap connectors together firmly. Turn on
water, check for leaks prior to final installation of
BREW EXPRESS. If leaking, turn off water, tighten connections
or reinstall quick connector. Turn water on and check again.
See Figure 8.
3" max
Power Panel
Figure 6
Quick Connect Detail
Figure 7
Figure 8