MacroAir Technologies Airvolution Installation Manual - Eco
Page
20
MacroAir Technologies Inc. www.macro-air.com Toll Free: 866-668-3247 Build: January 9 2009
3 Installation Procedures For
eco
6 Guard Fan
Step 1
, Install Mounting Assembly
For Wall-Mounted Applications
A)
Mark a level line on the wall at the desired mounting height to locate the top edge of the
upper mount plate.
B)
Use the mount as a template to carefully mark the locations of the mounting holes on the
wall. There should be six holes total: four in the upper plate and two in the lower plate.
Be sure to align the top edge of the upper mount plate with your level line.
C)
Remove the mount from the wall and pre-drill mounting holes for the appropriate
mounting fasteners.
For concrete or masonry walls:
i)
Insert Red Head or equivalent 1/2” self-anchoring studs (not included) into the
mounting holes, properly securing them according to manufacturer’s instructions.
ii)
Slide the mount plates over the studs and attach using nylon lock nuts and flat
washers, being careful not to over-tighten.
Note: We recommend that nylon lock nuts not be removed and reused because this
will defeat the nylon locking; instead, buy new nylon lock nuts from your local
hardware store.
For wood surfaces (wood studs): Before mounting the fan to a wood surface, ensure that
the structure will safely support the fan’s weight (see spec. sheet).
i)
Line the mount assembly up with the mounting holes.
ii)
Insert 1/2” lag bolts (not included) into the holes, using washers to maximize the
hold. Be sure that you use bolts long enough to support the weight of the fan.
Tighten the bolts securely, but do not over-tighten them.
Fig 10