Pacific Energy NEO 1.2 EU A SERIES Owners Manu

Summary of NEO 1.2 EU A SERIES

  • Page 1

    Neo 1.2 eu-en installation & operating instructions safety notice if this stove is not properly installed, a house fire may result. For your safety, follow the installation instructions. Contact local building or fire officials about restrictions and installation, inspection requirements in your are...

  • Page 2: Table of Contents

    050416-16_neo 1.2 eu-en please save these instructions this manual describes the installation and operation of the pacific energy, neo 1.2 freestanding wood heater. Safety notice: if this stove is not properly installed, a house fire may result. For your safety, follow the instal- lation instruction...

  • Page 3: Rating Label

    120416-24_neo 1.2 eu-en operator instructions rating label under the clean air act local authorities may declare the whole or part of the district of the authority to be a smoke control area. It is an offence to omit smoke from a chimney of a building, form a furnace or from any fixed boiler if loca...

  • Page 4: Safety

    120416-24_neo 1.2 eu-en operator instructions chimney smoke and creosote formation when wood is burned slowly, it produces tar and other organic vapours, which combine with expelled moisture to form creosote. The creosote vapours condense in the relatively cool chimney flue of a slow burning fire. A...

  • Page 5: Operation

    120416-24_neo 1.2 eu-en operator instructions avoiding a chimney fire there are two ways to avoid chimney fires: 1. Do not let creosote build up to a point where a big chimney fire is possible. 2. Do not have fires in the stove that may ignite chimney fires. These are hot fires, such as when burning...

  • Page 6

    120416-24_neo 1.2 eu-en operator instructions how to test your wood add a large piece of wood to the stove when it has a large, hot bed of coals. It is dry if it is burning on more than one side within one minute. It is damp if it turns black and lights within three minutes. If it sizzles, hisses an...

  • Page 7

    120416-24_neo 1.2 eu-en operator instructions warning: do not use grates or andirons to elevate the fuel. Burn directly on the fire bricks. Replace broken or missing bricks. Failure to do so may create a hazardous condition. Restarting from hot embers if there is insufficient burning material in the...

  • Page 8: Maintenance Checks

    120416-24_neo 1.2 eu-en operator instructions maintenance checks check the following parts for damage such as cracks, excessive corrosion, burned out sections and excessive warping: (see website for descriptions and more detail) some warping of the baffle is normal (up to 65cm). Replace if the baffl...

  • Page 9

    120416-24_neo 1.2 eu-en operator instructions chimney. On the other hand, a black greasy deposit that is difficult to remove is a result of wet and green wood and too slow a burning rate. This heavy deposit is building up in the chimney as well. Warning: only use materials and components supplied by...

  • Page 10: Troubleshooting

    120416-24_neo 1.2 eu-en operator instructions problem cause cure glass is dirty 1. Wood is wet - use dry wood 2. Turning down air control - do not turn down until or damper too soon a) there is a good bed of coals b) the wood is charred 3. Draft too low - improper chimney height and / or diameter - ...

  • Page 11: Warranty Information

    120416-24_neo 1.2 eu-en operator instructions warranty information pacific energy limited lifetime warranty wood products pacific energy extends the following warranty coverage to the original registered purchaser of the product: ltd lifetime coverage (15 years) • limited lifetime coverage is extend...

  • Page 12: Stove Dimensions

    Installation instructions stove dimensions 615mm 650mm 690mm 380mm figure 1: ne12.24 dimensions. 807mm 841mm 688mm 420mm 89mm figure 2: ne12.32 dimensions. Ne12.24 dimensions ne12.32 dimensions installation instructions 12 120416-24_ neo 1.2 5055.600eu-a.

  • Page 13: Assembly

    Installation instructions side panel installation 1. Carefully remove the panels from the box. 2. Loosen the panel bracket screws a little so that the bracket can move while fitting the panel into place (figure 6). 3. Engage the tabs of the panel into the slots in the front mounting bracket (figure ...

  • Page 14

    Installation instructions figure 5: slide panel in to place. Tab tab tab tab panel bracket figure 4: panel bracket.Ai figure 6: panel adjustments. Align panel with unit base figure 7: base of panel and alignment. 14 120416-24_ neo 1.2 5055.600eu-a.

  • Page 15: Installation

    Installation instructions installation warning: under no circumstances is this stove to be installed in a makeshift or "temporary" manner. It may be fired only after the following conditions have been met. • *do not attempt to connect this stove to any air distribution duct. • outside combustion air...

  • Page 16: Floor Protector

    Installation instructions floor protector the stove may be installed on a combustible floor provided noncombustible ember protection is used. This protection must extend as follows: uk: the hearth protection must be 12mm thick and protrude at least 305mm in front of the unit. See figure 9, below. Ch...

  • Page 17: Combustion Air

    Installation instructions combustion air intake or combustion air can be supplied to the stove in one of two ways. Consult your local building code or national installation code for solid-fuel-burning appliances and equipment before proceeding. The unit must have adequate air for combustion provided...

  • Page 18: Optional Blower

    Installation instructions the optional blower kit (wodc.Blow) is equipped with a three prong power cord and may be installed at any time. Follow installation instructions supplied with the kit. Route power supply cord away from heater. Electrical rating: 115 volts a.C., 60hz, .5 amps. Fan output rat...

  • Page 19

    Installation instructions fireclay flue liner concrete cap chimney approved through - wall installation as per local and federal codes 52" (1.32m) minimum minimum 7' (2.1m.) ceiling height 48" (1219 mm) non-combustible floor protector hooded vent or 90 elbow turned down *3" diameter air inlet with r...

  • Page 20

    Installation instructions spark arrester rain cap certified chimney storm collar roof flashing chimney support wall thimble alternate up and out installation non-combustible floor protector hooded vent or 90 elbow turned down attach to floor for mobile homes 3" diameter air inlet with rodent screen....

  • Page 21

    Installation instructions complete brick set ..........................................................Ne12.Bric-a a 4 1/2” x 5 1/2” x 1 1/4” ............................(39 mm x 115 mm x 32 mm) b 3” x 4 1/2” x 1 1/4” ...................................(77 mm x 115 mm x 32 mm) c 9” x 4 1/2” x 1 1/4”...

  • Page 22: Replacement Parts - Neo 1.2

    Installation instructions 1............ Enamel panel set ....................... Ne12.32ppxxa (xx = color codes) 1(a) ....... Painted panel set ...................... Ne12.32pmbka 2............Door catch .......................................... Ne16.7825 3............Gasket guide/glass retainer .....

  • Page 23

    060416-24_neo 1.2 eu-en 23 5055.600eu-a.

  • Page 24

    Pacific energy fireplace products ltd. 2975 allenby rd., duncan, b.C. V9l 6v8 for technical support, please contact your retailer. Web site: http://www.Pacificenergy.Net printed in canada © 2016 copyright pacific energy fireplace products ltd reproduction, adaptation, or translation without prior wr...