Pacific Proteus 26 Operating & Maintenance Instructions

Other manuals for Proteus 26: Operating & Maintenance Instructions
Manual is about: Automatic

Summary of Proteus 26

  • Page 1

    The contents of this manual are based on the latest product information available at the time of publication. Pacific steamex reserves the right to make changes or improvements to its machines without notice. For your convenience, record the following important information: model serial number part n...

  • Page 3

    Table of contents important safety instructions symbols used on the machine machine preparation 1. Unpacking the machine 2. Battery installation 3. Connecting the battery charger 4. Charging the batteries 5. Connecting the battery connector 6. Battery charge level indicator 7. Handle bar height 8. S...

  • Page 5

    Read and understand all instructions and warnings before operating this machine! Warning: to reduce the risk of fire, electric shock or injury: 1.You must have training in the operation of the machine before using it. Read the instruction book. If you do not understand any instruction, ask your super...

  • Page 6: Symbols Used On The Machine

    Symbols used on the machine 6 symbol for the water valve: it is used to indicate the solenoid valve switch. Symbol for the brush or pad: it is used to indicate the brush motor switch. Symbol indicating the raised or lowered position of the brush base: it indicates the lever for lifting the brush bas...

  • Page 7: Symbols Used On The Machine

    Symbol indicating the adjustment lever for the handle bar height. 7 symbols used on the machine off/on o/i symbol for the key switch. Symbol indicating the charge level of the batteries: it is necessary to recharge the batteries when the light begins to blink. The symbol denoting the brake. It is us...

  • Page 8

    2. Battery installation the batteries shipped with this machine are gel cell maintenance free batteries. The two 12 volt batteries fit in the compartment under the recovery tank. For charging maintenance, follow the instructions provided by the charger manufacturer. 8 machine preparation 1. Unpacking...

  • Page 9

    9 machine preparation 5. Place the batteries in their compartment. 6. Connect the batteries’ connector (2) to the machine’s connector (1). 7. Reassemble the recovery tank, vacuum plug and squeegee hose. 3. Connecting the battery charger the battery charger’s connector fits into the battery connector ...

  • Page 10

    10 machine preparation 5. Connecting the battery connector after charging the batteries, reconnect the battery connector (2) to the connector of the machine (1). 6. Battery charge level indicator the batteries’ indicator is digital with 4 fixed positions and a blinking one. The numbers, which appear ...

  • Page 11

    8. Squeegee assembly the squeegee is assembled as shown in the figure. The squeegee lever should be in its up position. Push on the rocker arm (1) and lock it into the stud bolt’s groove to secure the squeegee in place. Then fit the squeegee hose into its coupling; the hose should be located to the ri...

  • Page 12

    12. Solution tank unscrew the water inlet plug and confirm the solution filter, which is located on the bottom left side, is properly assembled. Warning! Always use low foaming detergent. Adding antifoam liquid into the recovery tank before cleaning will also help prevent foaming. Never use pure acid....

  • Page 13

    13 operation operating 1. Connect the machine connector (1) to the battery connector. 2. Turn the key (2) clockwise to on. The signal light will come on (3), indicating the batteries are charged. Note: if the battery indicator is blinking, the batteries need to be charged. 3. Press the solenoid valv...

  • Page 14

    Movement these machines are equipped with electronically controlled traction, with two speeds foward and one backwards. To move the machine, turn the key (1) on, wait for 3 seconds and then rotate the lever (2) on the handle bar - rotate forward to move forward or backward to move in reverse. The fir...

  • Page 15

    15 upon completion of the work after finishing your work and before any type of maintenance is done, it is neces- sary to do the following: 1. Close the water valve through lever (1). 2. Raise the brush base with lever (2). 3. Lift the squeegee with lever (3). Note: the squeegee blades can be damaged...

  • Page 16

    16 daily maintenance cleaning the recovery tank 1. Empty the recovery tank by removing the drain plug from the drain hose. 2. Unscrew the drain plug and empty the recovery tank. Use gloves for protection from contact with dangerous solutions. 3. Lift the recovery tank. 4. Take off the vacuum plug (2...

  • Page 17

    17 daily maintenance replacing the squeegee blades check the squeegee blades for wear and if necessary, change them. To replace the squeegee blades: 1. Remove the squeegee hose from its coupling. 2. Push on the rocker arm and loosen the stud bolt. 3. Remove the squeegee from its support. 4. Loosen t...

  • Page 18

    18 weekly maintenance cleaning the squeegee hose weekly or whenever the suction is insufficient, make sure the squeegee hose is not obstructed. To clean: 1. Take off the hose from its coupling on the squeegee. 2. Take off the other end from the recovery tank. 3. Wash the inner part of the hose with a...

  • Page 19

    19 trouble shooting guide insufficient water onto the brushes 1. Make sure the water valve is open (lever 1). 2. Confirm there is water in the solution tank. 3. Make sure the solenoid valve switch is on. The machine does not clean satisfactorily check the condition of the brush and replace it if nece...

  • Page 20

    04/05 865615 warranty policy pacific limited warranty the pacific proteus 26 has been manufactured, tested and inspected in accordance with specific engineering requirements. This machine is warranted to be free from defects in workmanship and materials for periods as follows from the date of purchase...