Protherm 24(12) KTO Operation And Installation Manual - Introduction
2
1. The boiler and all the associated
equipment must be installed and used
in accordance with the installation
design, all the corresponding valid legal
prescriptions and technical norms and
with the manufacturer’s instructions.
2. The boiler may be installed only in an
environment for which it is designed.
3. After installation, the boiler may be put
into operation by an authorised service
organisation only.
4. The boiler complies with the prescripti-
ons valid in the Slovak Republic. When
used in the conditions of other count-
ries, any applicable deviations must be
identifi ed and addressed.
5. In the event of a defect call the
manufacturer’s service organisation
– any unauthorised intervention may
damage the boiler (and possibly also
associated equipment!).
6. The service technician putting the boiler
into operation for the fi rst time is obliged
to familiarise the user with the safety ele-
ments of the boiler, their characteristics
and with the relevant required response
of the user, with the fundamental parts
of the boiler and manner of use of the
boiler. If this technician is also delivering
the boiler, he/she must ensure that the
original packaging of the boiler is availa-
ble for potential further transport thereof
until the moment of launch into operati-
on.
7. Check whether the delivery is comple-
te.
8. Check whether the model and type
supplied corresponds to the type
required for use, i.e. check whether the
data relating the boiler settings stated
on the plate correspond with the data
relating to the local network supplying
fuel (gas) to the place of installation, or
have this performed by a professional
technician who shall install the boiler or
put it into operation.
9. Whenever you are not suffi ciently certain
of how to control the boiler, seek out and
study all the corresponding instructions
in this Operation and Installation Guide
carefully and proceed accordingly.
10. Never remove or damage any markings
and signs on the boiler. Also store the
original packaging of the boiler in an
undamaged condition for potential fur-
ther transport in the case that the boiler
is not put into operation.
11. When performing any repairs, only ori-
ginal parts may be used. It is prohibited
to make any changes to the boiler’s
internal installation, or to interfere with
this in any way.
12. When shutting the boiler down for a
longer period of time, we recommend
that you close the gas supply and dis-
connect the boiler from the electricity
network. This recommendation applies
in conjunction with the general condi-
tions stipulated in this Operation and
Installation Guide.
13. At the end of its useful life, the boiler or
its parts must be disposed of ecologi-
cally, in a manner which avoids causing
any harm to the environment.
14. The manufacturer is not liable for and
provides no warranty for damages cau-
sed by the failure to abide by:
• the conditions stipulated in this Operati-
on and Installation Guide;
• prescriptions and norms;
• proper installation and operation proce-
dures;
• conditions stated in the Warranty Certi-
fi cate and the Service Book.
15. If the boiler is delivered to the user by