Protherm Lion 24 KKV Operation And Installation Manual - Introduction
2
Dear customer,
you have become the owner of a Protherm
Lion wall-mounted condensing boiler,
designed to run on natural gas.
Please note:
The boiler can be also run on
propane, too, provided the requirements
detailed in this Operation and Installation
Guide are met.
Lion 24 KKV and 28 KKV are boilers with
forced exhaust of combustion gases,
intended for heating of heating water
(HeW) in central heating systems and for
heating domestic hot water (HoW) in a
fl ow-through method. Lion 28 KKO in its
basic version is intended only for heating of
heating water in central heating systems.
Using a kit available for this purpose, Lion
28 KKO can be extended to heat also hot
water in an external tank.
We trust that the Protherm Lion condensing
boiler will give you a long and satisfactory
service. However, in order to achieve
this, all conditions important for its safe
operation must be met. Therefore please
study this Guide carefully and respect all
principles stated therein.
1. When installing and using the boiler,
follow all manufacturer’s instructions and
warnings in this Guide.
2. The boiler and all associated equipment
must be installed and used in accordance
with design, all applicable valid laws,
regulations and technical specifi cations
and Operation Guide for the product.
3. Call a service technician authorised by
the manufacturer to install, convert and
set up the boiler.
4. Only a service organisation authorised
by the manufacturer may put the boiler
into operation following the installation.
5.
The boiler complies with regulations
applicable in the Slovak Republic. When
used in the conditions of other countries,
any deviations from local regulations
must be identifi ed and rectifi ed.
6.
In the event of a defect, call a
manufacturer’s service organisation –
any unauthorised interference may
damage the boiler (and possibly also
associated equipment!).
7. The authorised service technician who
puts the boiler into service for the fi rst
time must show the user the boiler’s
functions, its different parts, safety
functions and controls. He must also give
the user a User’s Guide and explain
anything unclear in it to him.
8.
Check completeness and integrity of
delivery.
9.
Check whether the model and type
supplied is suitable for the required use.
10. Whenever you are not certain how to
control the boiler, study appropriate
instructions in this Operation and
Installation Guide carefully and proceed
accordingly.
11. Never remove or damage any markings
and signs on the boiler.
12. When making any repairs, only original
parts must always be used. It is forbidden
to make any changes to the boiler’s
internal installation, or to interfere with it
in any way.
13. When shutting the boiler down for a
protracted period of time, we recommend
to shut the gas supply, heating water and
hot water off and disconnect the boiler
from power supply. This recommendation
applies in conjunction with the general
conditions stipulated in this Operation
and Installation Guide.
14. Handle the boiler and its part upon the
end of its service life in compliance with
environmental requirements.
15.
The manufacturer disclaims any
responsibility for damages caused by
the failure to abide by:
• the conditions stipulated in this Operation
and Installation Guide;
• applicable regulations and standards;
•
proper installation and operation
procedures; and