Rail King Fire Station User Manual - Iring
W
IRING
I
NSTRUCTIONS
The RailKing® Fire Station is made up of three components: the fire station
building and base, the fire truck, and the activation button. Before you
place the fire station on the layout, you must wire the station to the
activation button and power source. In order to connect power to each
component, the six (6) enclosed wires must be connected to the wiring posts
located on the underside of the fire station and the activation button. Wires
from ports A-C control the fire truck operation. Wires from ports D-E control
the lights. Follow the diagram (Fig 1) shown to make the correct
connections.
A
B
C
D
E
Connect Red wire to
transformer AC and
connect Black wire to
activation button
Connect Black wire to
transformer ground
Connect Black wire to
activation button
Connect Red wire to
transformer AC
Connect Black wire to
transformer ground
Fig 1. Wiring Diagram
A
B
C
D
E
Strip Z-wire cable harness
insulation to reveal 1/4” of
bare wire.