Rion GH40 Assembly Instructions Manual - page 13
11
Back Pediment
Put ST7 couplers on the PN8R and PN8L pediment panel halves with the ID plastic strip facing outside. The
tops of each coupler are trimmed to match the angle of the panel. Slide the two pediment panel halves
together.
Assemble all parts of the back pediment except for the 7A connector and the R8 profile and slide the
assembled PN8R/PN8L pediment panel into the open space of the pediment. Complete the back pediment,
taking advantage of the flexibility of the profiles.
Lock the pediment in place using pins and remove the ID strips from the panels.
Slide two GSC10 strengthening bars into both sides of a 10 connector, one in the upper section and the other
in the lower section. They will overlap inside the connector and their ends will be flush with the far end.
Slide two E2 profiles over the GSC10 strengthening bars. The ends of the strengthening bars will extend
beyond the E2 profiles.
Complete the back pediment support with the 10 connectors, E2 profiles and 4A and 3A connectors as
shown.
Put the remaining profiles on the back pediment top.
Slide the back pediment panels in as shown. Make sure that the plastic ID strip faces the outside.
Note:
If you have purchased one or more optional Louvered Windows insert them instead of the PN9 panels.
Put the back pediment support in place, taking advantage of the flexibility of the profiles.
Lock everything into place using pins and remove the ID strips from the panel.