Saeco Lirika Operating Instructions Manual

Other manuals for Lirika: User Manual
Manual is about: SUP041EU

Summary of Lirika

  • Page 1

    English operating instructions read these operating instructions carefully before using the machine. Type sup041e en 02 02.

  • Page 2

    • 2 • 1 1 2 3 4 5 6 9 10 11 16 17 12 22 18 23 24 25 19 20 21 7 8 14 15 13.

  • Page 3

    • 3 • 2 5 8 11 3 6 9 12 4 7 10 13.

  • Page 4: Intended Use

    • 4 • safety instructions never allow water to come into contact with any of the electrical parts of the ma- chine: danger of short circuit! Hot water and steam may cause scalding! Intended use the machine is intended to be used in small of- fi ces/organisations only. The appliance is not to be used...

  • Page 5: Cleaning

    • 5 • alert the service provider, who will carry out a safety check. Cleaning before cleaning the machine, the power button must be switched to off (0) and the plug must be removed from the power socket. Wait for the machine to cool down. Never immerse the ma- chine in water! It is strictly forbidde...

  • Page 6: Contents

    • 6 • machine use - user manual contents 1 general information ...................................... 7 1.1 intended use of the machine .......................................7 1.2 how to read the manual..............................................7 1.3 how to use these operating instructions ........

  • Page 7: 1 General

    • 7 • machine use - user manual 1 general information 1.1 intended use of the machine this machine automatically brews: - coff ee and espresso coff ee using coff ee beans; - hot beverages using hot water and/or steam dispensed via the dispensing spout; - milk-based beverages using the supplied panna...

  • Page 8: 2 Machine

    • 8 • machine use - user manual 1.5 technical specifi cations technical specifi cations power supply and nominal voltage-power rating see plate attached to the back of the appliance machine housing material metal - thermoplastic material size (w x h x d) 215 x 370 x 429 (mm) weight approx. 8 kg powe...

  • Page 9: Using The Machine

    • 9 • machine use - user manual 2.1 control panel description note: all possible controls are described here. Refer to the following sections for the operating modes. Reference - description 18 "espresso" button when this button is pressed an espresso coff ee is brewed. 19 "brew" button when this bu...

  • Page 10

    • 10 • machine use - user manual 3.3 turning on the machine warning! Connection to the power supply should be carried out exclusively by the service provider! Before turning on the machine, ensure that the plug is correctly inserted in the power socket. 1 to turn on the machine, move the power butto...

  • Page 11

    • 11 • machine use - user manual 3.6 eco-friendly: stand-by the machine is designed for energy saving. The machine auto- matically turns off after 30 minutes of inactivity. Note: - during the turning off phase, the machine will per- form a rinse cycle if a coff ee product has been brewed. - time can...

  • Page 12

    • 12 • machine use - user manual machine; the display shows the 2 cups icon. Green 2 once the prebrewing cycle is complete, coff ee begins to come out of the dispensing spout. 3 coff ee brewing stops automatically when the set level is reached. However, the coff ee brewing process can be stopped man...

  • Page 13

    • 13 • machine use - user manual note: it is advisable to also empty the drip tray (see section 6.3). Only when the display shows the following icons in sequence: red red may the coff ee grounds drawer be inserted into the machine. Af- ter inserting the drawer, the display shows the icon: green the ...

  • Page 14: 5 User

    • 14 • machine use - user manual 3.13 dispensing hot water danger of burning! Dispensing may be preceded by small jets of hot water. The pannarello may reach high temperatures: do not touch it with bare hands. Use the appropriate protective handle only. 1 place a container under the pannarello (fig....

  • Page 15

    • 15 • machine use - user manual 5.1 machine functions the following functions can be programmed: coff ee temperature this function allows you to adjust the coff ee brewing tempera- ture. Yell ow timer (stand-by) this function adjusts the time taken for the machine to go into stand-by mode after the...

  • Page 16: Cleaning And Maintenance

    • 16 • machine use - user manual 6.1 cleaning the pannarello warning. Before performing this operation, make sure that the wand is cold: danger of burns! Daily cleaning it is important that you clean the pannarello daily or after each use as it preserves hygiene and ensures perfect milk froth consis...

  • Page 17

    • 17 • machine use - user manual 6.4 brew group - weekly cleaning the brew group should be cleaned whenever the coff ee bean hopper is fi lled, or at least once a week. 1 turn off the machine by switching the power button to the "o" position and remove the plug from the socket. 2 remove the drip tra...

  • Page 18

    • 18 • machine use - user manual 5 wash the brew group with lukewarm water and carefully wash the upper fi lter. Before placing the brew group in its seat, ensure that there is no water left in the brewing chamber. 6 remove the coff ee residues drawer and wash it thoroughly. 7 clean the inside of th...

  • Page 19

    • 19 • machine use - user manual 12 insert the brew group into its seat again until it locks into place, without pressing the "push" button. 13 insert the coff ee grounds drawer and the drip tray. Close the service door..

  • Page 20: 7 Machine

    • 20 • machine use - user manual 7 machine warnings this chapter describes all the warning messages that the machine may display to the user, and the actions that can and/ or must be performed by the user. Warning signals (yellow colour) how to reset the message the machine is in warm-up phase to br...

  • Page 21

    • 21 • machine use - user manual warning signals (red colour) how to reset the message insert the drip tray and the coff ee grounds drawer into the machine and close the service door. Fill the coff ee bean hopper. This icon appears for 5 seconds, from when the machine detects that it has fi nished t...

  • Page 22: Handling And  Storage

    • 22 • machine installation - service provider manual 8 handling and storage all the operations described in chapter 8 must be performed exclusively by the service provider or a specialised technician, who shall organise all the operating steps and use only suitable means to en- sure strict complian...

  • Page 23

    • 23 • machine installation - service provider manual • before cleaning the machine, ensure the plug is disconnected from the power socket; do not wash it with fuel and/or sol- vents of any kind. • do not place the machine near heating equipment (such as heaters or radiators). • in case of fi re, us...

  • Page 24

    • 24 • machine installation - service provider manual 9.4 assembly-siting the machine should not be installed outdoors or in environments in which jets of water or steam are used. The presence of magnetic fi elds or proximity to electrical machines which generate interference could cause the electro...

  • Page 25

    • 25 • machine installation - service provider manual 9.8 electrical connection this operation must only be performed by special- ised technical personnel or by the service provider. The machine is designed to work with single-phase voltage matching the rating indicated on the identifi cation plate ...

  • Page 26

    • 26 • machine installation - service provider manual 9 fill the water tank again up to the max level. The machine is now ready for use. 9.11 measuring and adjusting water hardness measuring water hardness is very important in order to correctly manage the "intenza+" fi lter and the frequency with w...

  • Page 27

    • 27 • machine installation - service provider manual a = soft water b = hard water (standard) c = very hard water 2 immerse the "intenza+" water fi lter vertically in cold water (with its opening positioned upwards) and delicately press its sides so as to let the air bubbles out. 3 remove the tank ...

  • Page 28

    • 28 • machine installation - service provider manual 9.12.1 replacing the “intenza+” water filter if the fi lter is already installed and the machine indicates that it must be replaced, proceed as previously described. When accessing the programming page, the “reset” option will also be available. ...

  • Page 29: 10 Machine

    • 29 • machine installation - service provider manual 10 machine programming all the operations described in chapter 10 must be performed exclusively by the service provider or a specialised technician, who shall organise all the operating steps and use only suitable means to en- sure strict complia...

  • Page 30

    • 30 • machine installation - service provider manual coff ee temperature this function adjusts the coff ee brewing temperature. 10.3 programming menu this menu manages certain machine operation parameters. Timer (stand-by) this function adjusts the time taken for the machine to go into stand-by mod...

  • Page 31

    • 31 • machine installation - service provider manual 0 0 0 confirm set psw confirm 0 0 0 0 credit charging this function activates credit charging. Note: this function is visible only if the "credit management" function is set to "yes". Password setting this function changes the password used to ac...

  • Page 32

    • 32 • machine installation - service provider manual 10.4 setting the password the password must be set by the service provider in order to prevent access by unauthorised personnel who could change the machine settings and cause malfunctions. To set the password, proceed as follows: 1 switch to pro...

  • Page 33

    • 33 • machine installation - service provider manual 10.5 setting credits credits can be set to allow coff ee to be brewed under the strict control of the service provider. To set the credits, proceed as follows: 1 switch to programming mode as described in section 10.1. Yell ow 2 press the “ ” but...

  • Page 34

    • 34 • machine installation - service provider manual 11 cleaning and maintenance all the operations described in chapter 10 must be performed exclusively by the service provider or a specialised technician, who shall organise all the operating steps and use only suitable means to en- sure strict co...

  • Page 35

    • 35 • machine installation - service provider manual 2 also lubricate the shaft. 3 insert the brew group into its seat again until it locks into place, without pressing the "push" button. 4 insert the coff ee grounds drawer and the drip tray. Close the service door. 11.3 descaling limescale is a na...

  • Page 36

    • 36 • machine installation - service provider manual 4 press the “ ” button (18) to start the descaling cycle. Yell ow note: if this option is confi rmed, the whole cycle must be completed. Press the " " button (22) to exit. 5 pour the entire contents of the bottle of saeco concentrated descaling s...

  • Page 37

    • 37 • machine installation - service provider manual 15 place a container under the steam/hot water wand and an- other one under the dispensing spout. 16 rinse the water tank thoroughly and fi ll it again with fresh drinking water up to the max level. 17 insert the tank into the machine. Yell ow 18...

  • Page 38: 12 Machine

    • 38 • machine installation - service provider manual 12 machine disposal in compliance with art. 13 of the italian legislative decree dated 25 july 2005, no. 151 "implementation of the directives 2002/95/ ec, 2002/96/ec and 2003/108/ec on the restriction of the use of certain hazardous substances i...

  • Page 39

    • 39 • machine actions causes solutions the brew group cannot be removed. The brew group is out of place. Turn on the machine. Close the service door. The brew group automatically returns to the initial position. The coff ee grounds drawer is inserted. Remove the coff ee grounds drawer before removi...

  • Page 40

    - rev .00 15-09-13 the manufacturer reserves the right to make changes without prior notice. 02 en 02.