Salicru SLC TWIN PRO Series User Manual

Manual is about: 4 to 20 kVA

Summary of SLC TWIN PRO Series

  • Page 1

    Uninterruptible power supply (ups) + lighting flow dimmer stabilizers (iluest) + switch mode power supply + static inverters + photovoltaic inverters + voltage stabilizers and power line conditioners ups slc twin pro series 4 to 20 kva uninterruptible power supply user's manual.

  • Page 3: General Index

    3 salicru general index 1. Introduction. 1.1. Acknowledgement letter. 1.2. Using this manual. 1.2.1. Conventions and used symbols. 1.2.2. For more information and/or help. 1.2.3. Safety instructions. 1.2.3.1. General safety warnings. 1.2.3.2. To keep in mind. 1.2.3.3. Safety warning regarding batter...

  • Page 4: 1.  Introduction.

    4 salicru 1. Introduction. 1.1. Acknowledgement letter. We would like to thank you in advance for the trust you have placed in us by purchasing this product. Read this instruction manual carefully before starting up the equipment and keep it for any possible future consult that can arise. We remain ...

  • Page 5

    5 salicru • if the instructions are not in total or partial and in special referred to the safety, do not carry on with the installation or commissioning tasks, because there could be a risk on your safety or on the other/s persons, being able to make serious injuries even the death, also it can cau...

  • Page 6

    6 • when replacing a fuse, do it for another of the same type, char- acteristics format and size. • under any concept the input power cord will be connected to the output of the equipment, either directly or through other ways. • models with separate bypass line, a galvanic isolation transformer has...

  • Page 7

    7 salicru do not clean the equipments with products that could have alcohol, benzene, solvent or other inflammable substances, or they are abrasive, corrosive, liquids or detergent. • when it is needed to remove the protection cover to access to the terminals, they will have to be put back before st...

  • Page 8: 2.  Quality And Standard

    8 2. Quality and standard guarantee. 2.1. Declaration of the management. Our target is the client’s satisfaction, therefore this management has decided to establish a quality and environmental policy, by means of installation a quality and environmental management system that becomes us capable to c...

  • Page 9: 3.  Presentation.

    9 salicru 3. Presentation. 3.1. Views. 3.1.1. Views of the equipment. Figures 1 to 3 show the illustrations of the equipment according to the case format and depending on the power of the model. Nevertheless and due to the constant evolution of the product, some discrepancies or small contradictions...

  • Page 10

    10 rs-232 epo protection cover for smart slot protection cover for parallel port protection cover for manual bypass switch (maintenance) usb protection cover for smart slot fans input switch m1 protection cover for power blocks rs-232 epo protection cover for parallel port protection cover for manua...

  • Page 11

    11 salicru battery switch protection cover for power blocks batteries module for models > 10 kva. Batteries module for models up to 10 kva. Battery switch power blocks fig. 3. Rear view batteries module..

  • Page 12

    12 3.2. Definition of the product. 3.2.1. Nomenclature. Slc-8000-twin/3 pro (b1) wco “ee29503” mod bat twin pro 2x6ab003 40a wco “ee29503” ee* special specifications of the client. Co “made in spain” marking in the ups and its packaging (custom issue). W neutral brand equipment. B0 no batteries and ...

  • Page 13

    13 salicru 3.3. Operating principle. This manual describes the installation and operating of the un- interruptible power supply (ups) from slc twin pro series as equipments that can operate separately or connected in parallel, without needing a centralised bypass. Upss from slc twin pro series assur...

  • Page 14

    14 3.4. Options. Depending on the selected configuration, the equipment can in- clude any of the following options: 3.4.1. Isolation transformer. The isolation transformer, provides a galvanic isolation that al- lows isolating the output from the input completely. The installation of an electrostati...

  • Page 15: 4.  Installation.

    15 salicru 4. Installation. • check the safety instructions, from section 1.2.3. • check that the data in the nameplate are the required by the installation. • a wrong connection or manoeuvring, can make faults in the ups and/or loads connected to itself. Read carefully the in- structions of this ma...

  • Page 16

    16 • in case of observing damages, make all pertinent claims to the transport agency or in their lack to our company. Never start up an equipment when external damages can be observed. • also check that the data in the nameplate sticked in the pack- aging and in the equipment, correspond to the ones...

  • Page 17

    17 salicru before downloading the equipment from the pallet, the stabilizer supports have to be removed (see figure 8), oth- erwise they will make difficult the process and they will be bent when impacting with the wooden ramp, making damages and the own case or cabinet structure of the equipment. P...

  • Page 18

    18 connect the power supply cables to input power blocks r (l1), s (l2), t (l3) and n, by respecting the phase rotation and neutral stated in the labelling of the equipment and in this manual. If this rotation is not respected, the equipment will not work. A wrong connection between the neutral and ...

  • Page 19

    19 salicru • connect the power supply cables to bypass power blocks r (m2) and n, by respecting the rotation of phase and neutral stated in the labelling of the equipment and in this manual (see figure 11). If this phase, neutral rotation is not respected there will be serious fault/s in the equipme...

  • Page 20

    20 accumulator cabinet or modules have battery protection too, and in this case, they are duplicated. An internal ones through fuses with no access for the end-user and an addi- tional ones by means of a two pole circuit breaker. • important for safety: in case of installing the batteries by yoursel...

  • Page 21

    21 salicru 4.3.7. Connection in parallel. 4.3.7.1. Introduction to the redundancy. N+x is usually the most reliable power structure. N means the minimum quantity of equipments that the total load needs; x means the quantity of redundant equipments, so it means, the quantity of faulty upss that the s...

  • Page 22

    22 • in parallel systems, the length and cross section of the cables that go from the switchgear panel till one of the upss and vice versa, will be the same for all of them without any exception. In the worst case, the following deviations have to be strictly respected: when the distance among the u...

  • Page 23

    23 salicru • make the needed connections in the alarm terminal strip. • put the new protection cover that it is supplied with the relays interface card and fix it through the same screws that fixed the original cover. 4.3.9. Software. • free software download - winpower. Winpower is a ups monitoring...

  • Page 24: 5.  Operating.

    24 5. Operating. 5.1. Commissioning. 5.1.1. Controls before commissioning. • make sure that all the connections have been made prop- erly and are sufficiently tight, respecting the labelling of the equipment and the instructions of chapter 4. • check that the ups switches and batteries cabinet/s are...

  • Page 25

    25 salicru 5.3. Operative for a parallel system. • the following operative, it is considered for equipments with the configuration preset from factory. • check that the load/s and output circuit breakers switches from protection panel, are in position "off". • turn "on" the following circuit breaker...

  • Page 26

    26 5.5. How to replace a faulty ups from the operating parallel system. Press over the key in any ups for more than 3 sec- onds to shutdown all the inverters. The acoustic alarm will beep for 3 seconds. The equipments that belong to the current parallel system will transfer to "bypass mode". Put all...

  • Page 27

    27 salicru or through the static bypass line ( twin/3 pro > 10 kva only), through the manual bypass of the equipment. Also, if the protection panel has manual bypass switch, remove the mechanical lock and turn the switch "on" (bypass). In this case and in this case only, turn the output switch/es fr...

  • Page 28: 6.  Control Panel With

    28 6. Control panel with lcd. 6.1. Control panel. Fig. 16. Control panel view. Button function description inverter start up with no ac power supply and battery connected to the equipment (b0 or b1 equipments), press the button for 1 sec. As minimum to start up the inverter. Ups start up when the un...

  • Page 29

    29 salicru code condition description color lcd 04 warning site wiring fault (ups only 4.. 10 kva twin). Blue 05 warning neutral or gnd loss (ups only 8.. 20 kva twin/3). Blue 11 state battery disconnect (ups only 4.. 10 kva twin). Blue 11 warning battery disconnect (ups only 8.. 20 kva twin/3). Blu...

  • Page 30

    30 6.1.4. Main screen. • ups control panel provides useful information about the status of the load, events, measures, identification and setting through the screen of the front panel. • immediately after the start up, the lcd panel shows the salicru logo for few seconds and next the main screen by ...

  • Page 31

    31 salicru bypass without output voltage: the ups is running on bypass mode without output voltage. Fig. 22. Bypass without output voltage screen. Eco mode: once the ups is started up, the energy that feeds the load/s comes from the commercial mains directly through the internal filters, meanwhile t...

  • Page 32

    32 6.3. Operating of the lcd panel. • less in the main screen, which summarizes the ups status, the user can get more useful information about the current conditions of the equipment, details of measures, event data logger, the own identification of the ups, and change the settings to be adapted to ...

  • Page 33

    33 salicru ups status summary (screen by default) alarm screen parallel system screen battery status screens press > 1 sec. Press o structure of ups status menu structure of main menu press fig. 31. Ups status screen. Press > 1 sec. Press o structure of data logger submenu structure of main menu pre...

  • Page 34

    34 6.3.3. Data logger submenu. • when pressing the key for less than 1 sec. From the "event log" screen, it is accessed to the event data logger structure (see figure 32). • alarm and faults data logger is registered in this submenu and each one includes the event code, as well as the period of time...

  • Page 35

    35 salicru press press press o (1) (2) (1) blinking option. (2) this option ends the blinking once validated. Fig. 35. Example of screens of epo status cleared. • restore the preset configuration from factory: all values are set to the preset values from factory. This action can only be done on bypa...

  • Page 36: 7.  Maintenance, Warranty

    36 7.2. Ups trouble shooting guide. If the ups doesn't work properly, check the information given by the lcd of the control panel, according to the models and power of the equipment. Try to solve the problem by means of the established steps in the tables 10 to 12. In case the problem persists, cons...

  • Page 37

    37 salicru 7.2.1. Troubleshooting guide. Warning indications. Indication in the lcd possible cause solution twin pro 4-10 kva twin/3 pro 8-20 kva read eeprom error - ups internal fault consult with the s.T.S. Emergency power off epo active alarm code:71 epo connector is open check the status of the ...

  • Page 38

    38 7.2.2. Troubleshooting guide. Fault indications. Indication in the lcd possible cause solution twin pro4-10 kva twin/3 pro 8-20 kva inverter overload fault inverter overload fault alarm code:42 overload check the load and remove the non-critical ones check if any load is faulty or damaged bypass ...

  • Page 39

    39 salicru input currents output voltages output currents temperatures battery voltage and currents. • check the battery status. • check the fan status. • bypass test. • make a general cleaning of the equipment. • controlling the mechanical parts and temperatures. This way, it is guaranteed the perf...

  • Page 40: 8.  Annexes.

    40 8. Annexes. 8.1. General technical specifications. Models: twin pro twin/3 pro ≤ 10 kva twin/3 pro > 10 kva available powers (kva / kw) 4 / 3.6 5 / 4.5 6 / 5.4 8 / 7.2 10 / 9 8 / 7.2 10 / 9 12 / 10.8 15 / 13.5 20 / 18 technology on-line double conversion, pfc, double dc bus rectifier tipology of ...

  • Page 41

    41 salicru models: twin pro twin/3 pro ≤ 10 kva twin/3 pro > 10 kva available powers (kva / kw) 4 / 3.6 5 / 4.5 6 / 5.4 8 / 7.2 10 / 9 8 / 7.2 10 / 9 12 / 10.8 15 / 13.5 20 / 18 batteries voltage / capacity 12 v dc / 7 ah 12 v dc / 9 ah 12 v dc / 9 ah quantity of batteries in serial / set voltage 20...

  • Page 42

    42 • igbt.- the insulated gate bipolar transistor is a semicon- ductor device that is used as a controlled switch in power elec- tronic circuits. This device has the feature of the gate signal of the effect field transistors with the capacity of high current and low voltage saturation of the bipolar...

  • Page 43

    43 salicru : .................................................................................................................................................................................................................... .............................................................................

  • Page 44

    Uninterruptible power supply (ups) + lighting flow dimmer stabilizers (iluest) + switch mode power supply + static inverters + photovoltaic inverters + voltage stabilizers and power line conditioners avda. De la serra, 100 08460 palautordera barcelona tel. +34 93 848 24 00 902 48 24 00 (only spain) ...