ASSEMBLING PROCEDURES
1. Use the Bolts and Washers from
Package B
to connect the
Long Stand (F) and the Square
Poles x 2 (E) together.
2. Connect the completed section from
Step 1
with the
Short Stand (G) using the Bolts and
Washers from
Package B.
3. Insert
Axis (H) through Short Stand (G).
Place the Sleeves and Washers from
Package
C onto each side of the Wheels (J) and then fix
with the Round Capped Nuts and Wrenches that
are provided in
Package D.
4. Turn the
Storage Cabinet (K) upside down
for easier assembly. Insert both ends of the
Short (G) and Long Stand (F) into the bottom
of the
Storage Cabinet (K) and secure with the
Bolts that are provided in
Package B.
5. Turn the complete unit back into the upright
position. Install the
Handrail (D) onto the left
hand side and the
Working Platform (C) on the
right hand side. Use the Bolts, Nuts and Washers
that are supplied from
Package A.
6. Place the
Main Unit (A) onto the top side of
the
Storage Cabinet (K).
CAUTION: The Power Cord outlet should be inserted into the U-Shape position.
7. Hook up the
Kettle (B) onto the hanger.
CAUTION: The Roller Bar should be on the Door side and also insure that the gears between
the
Kettle (B) and Ceiling are perfectly matched.
8. Open the door of the
Storage Cabinet (K) and release the Spring Shaft beneath the main
unit in order to fix the
Main Unit (A) with the Storage base.
NB. The Main Unit (A) alone could be used and placed onto a stable counter top for operation.