T&C TC42.NG05.C Installation Instructions Manual

Summary of TC42.NG05.C

  • Page 1

    160508-12 tc42.Ng05.C 5056.426.C5 installer: leave this manual with the appliance. Consumer: retain this manual for future reference. These instructions are supplementary to the installation and operating instructions supplied with the fi replace and should be kept together. Refer to the installatio...

  • Page 2: Contents of Package

    Contents of package 2 tc42.Ng05.C 160508-12 • burner assembly (including pilot and manifold) • log grate • ember material (one bag) • coal chunks (one bag) • vermiculite (one bag) • hardware package.

  • Page 3: Burner/ Grate Installation

    Fig. # 3 3 tc42.Ng05.C 160508-12 1. Attach the burner assembly to the fl oor of the fi rebox with two screws. (fig. # 1) 2. Attach the manifold supply tube to the bulk head fi tting and tighten. (fig. # 2) ensure that there are no leaks. 3. Attach the pilot supply tube to the bulk head fi tting and ...

  • Page 4: Ember Material

    4 tc42.Ng05.C 160508-12 fig. # 6 ember material fig. # 6a a large bag of ember material is shipped with the fi replace and needs to be installed on the burner to ensure optimum performance and fl ame appearance. A bag of coal chunks and lava rock is also supplied this must only be used around the bu...

  • Page 5: Log Set Assembly

    5 tc42.Ng05.C 160508-12 fig. #9 fig. #11 fig. #12 fig. #10 fig. # 7 the logs are packaged in a foam pack inside the box, they are fragile and should be handled with care. Unpack and inspect log set. There should be a total of 9 logs. Gas plumbing and vent connections should be position the logs as i...

  • Page 6: Propane Conversion

    Propane conversion if the unit is to be used on propane, convert as follows using the compo- nents supplied with this fi replace: caution the gas supply and electrical power must be shut off before proceeding with the conversion. Fig. # 17 fig. # 18 fig. # 16 warning this conversion kit shall be ins...

  • Page 7

    Minimum rate screw 7. With a 7/16” wrench loosen the pilot head on the pilot assembly by a half-turn (fig. #19) 8. Slide the pilot adjustment band over and ensure that the hole in the orifi ce band is showing. (fig. #20 shows ng position, fig. # 21 shows lp position) 9. Remove the minimum rate screw...

  • Page 8

    8 tc42.Ng05.C 160508-12 minimum rate screw ng lp fig #23 fig #24 fig #25 fig #26 10. Replace the minimum rate screw with the one provided in the propane conversion kit supplied with this fi replace. Ensure that the screw is fully installed. (fig. #23) 11. Pull off the rubber cap from the top of the ...

  • Page 9: Gas Pressure Check

    9 tc42.Ng05.C 160508-12 1. Remove the plug from the manifold test port. The plug is located between the right side lintel and fi rebox side (bottom port). (fig. # 27) 2. Thread the extension test fi tting into the open test port. (fig. #28) 3. Attach a pressure gauge onto the fi tting. 4. When testi...

  • Page 10: Burner Flame Adjustment

    10 tc42.Ng05.C 160508-12 fig. # 29 the air shutter on the burner tube controls the primary combustion air to the gas burner and is preset at the factory for natural gas fuel. Some adjustment may be necessary to obtain desired fl ame and to eliminate carbon deposits. Evaluate fl ame appearance after ...

  • Page 11: Replacement Parts

    11 tc42.Ng05.C 160508-12 replacement parts item .......Description ........................................... Part no. #1.......... Tc42.Ng01 burner assembly .... Tc42.90859c #2.......... 9 pcs log set ................................. 5098.32 #3.......... Orifice, natural gas (#25) ........ 5022.1...

  • Page 12

    Technical support: 1-888-715-2664 www.Townandcountryfi replaces.Net 2975 allenby rd., duncan, bc v9l 6v8 printed in canada.