U-Line 2275DWRWOL Installation Manual - page 13
02/2007
13
www.U-LineService.com
2275DWRWS/2275DWRWOL —
Drawer Model Wine Captain
®
Leveling Information
Note: It is recommended that the unit is level.
1. Use a level to check the levelness of the unit from front
to back and from side to side. Level should be placed
along top edge and side edge as shown (see Figure 19).
2. If the unit is not level, adjust the feet on the corners of
the unit as necessary (see Figure 20).
3. Check the levelness after each adjustment and repeat
the previous steps until the unit is level. Go on to
8 Install the Unit.
Installation Tip
If the room floor is higher than the floor in the cut-out
opening, adjust the rear feet to achieve a total unit rear
height of 1/8" less than the opening’s rear height. Shorten
the unit height in the front by adjusting the front feet.
This allows the unit to be gently tipped into the opening.
Readjust the front feet to level the unit after it is correctly
positioned in the opening.
Installation of the Drawer Wine
Captain
®
1. Plug in the power cord.
2. Gently push the unit into position. Be careful not to
entangle the electrical cord.
3. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit’s top
surface should be approximately 1/8" below the
countertop.
Anti-Tip Kit Installation
WARNING
• The Anti-Tip Kit must be installed on this unit
before it is used.
• Additional blocking or special fasteners may be
required for installation. Installer is responsible
for secure attachment to prevent the unit from
tipping.
• Make sure the mounting screws attaching the
unit to the counter, cabinet or wall are deep
enough into the mounting surface to support the
weight of the drawers and the items that will be
inside the drawers.
• Never use the drawers as steps or as a shelf to
support more than the drawers’ content. Serious
personal injury could occur.
After leveling, the unit must be secured to a counter, a
cabinet or a wall to prevent tipping.
1. Open the upper drawer to expose the six screws (A)
installed at the top two corners (three at each corner).
Remove the appropriate screws for horizontal or
vertical mounting (see Figure 21). Do not discard.
7 Level the Unit
Check Level
ULIN_0152a_A
Figure 19
ULIN_0046_A
Figure 20
8 Install the Unit