Valor PORTRAIT 575LFK Installation Instructions Manual - page 3
3
x
x
x
37-15/16”
(964 mm)
29-1/8”
(739.7 mm)
23-11/16” (601.6 mm)
13-5/16”
(338.5 mm)
24-5/8” (625 mm)
B
A
Ceiling
576LCP
optional
panel
36”
(914 mm)
min.
See table
14-5/8”
(371.5 mm)
3”
(76.2 mm)
min.
4-15/16”
(109.5 mm)
Zero
clearance
Gas line access
point through
casing
Gas line access
point 8-1/2” (216 mm)
Gas line connection
point 3/8” NPT FEMALE
at valve
Zero clearance
Sidewall
Mantel
Minimum 53-7/8” (1368.4 mm)
Zero clearance
M
inimum
17-1/4”
(438.1 mm)
Minimum 38”
(967.3 mm)
Minimum
12-1/4”
(311.5 mm)
90°
Front View
Top View
Right Side View
Corner Dimensions
Dimensions & Clearances to Combustibles
Mantel
Depth ‘A’
0–15”
(0–381 mm)
16”
(406 mm)
18”
(457 mm)
20”
(508 mm)
22”
(559 mm)
Mantel
Height ‘B’
2”
(51 mm)
3”
(76 mm)
5”
(127 mm)
7”
(178 mm)
9”
(229 mm)
Casting Tolerances
Due to the nature of cast iron and concrete, dimen-
sional consistency may vary from one unit to the
next and some variation in surface fi nish and fl at-
ness is to be expected. We have done our best to
control and make allowance for this; however some
variation is inevitable.
Floor Requirements
The 530 heater is approved for installation directly
on any combustible material other than soft fl ooring
material such as carpet or vinyl.
Mobile Home Floor Fixing
The Lift FS must be fi xed to the fl oor through the
fl oor when used in a mobile home.
Mantel Requirements
The Lift FS may be installed with a combustible
mantel provided clearances are maintained as
indicated below. Be aware that although safe,
some combustible materials and fi nishes at the
listed clearances may, over time, discolor, warp,
or show cracks. Care should be taken when
choosing materials—consult your fi replace dealer.
Combustible Mantel Clearances