Vari BDR-595 D Adela Instructions For Use Manual - page 24
BDR-595 Adela
24
6.7 Table of service operations.
Operation
During season
After season
Gearbox oil volume check
1x monthly
yes,*
Engine oil volume check
prior to each machine use
**
Engine air filter check
prior to each machine use
check
Check of blades for fastening and
intectness
prior to each machine use, ***
check
Check of upper and lower disks for
their intactness and fastening
prior to each machine use, ***
check
Check of V-belt tension
after 2 hrs., then each 20 hrs.
or as required
check
Check of V-belt condition
as required
check, ****
Cleaning of wheel hubs and grease
exchange
-
yes
Cleaning of machine dirt and debris after each end of work
yes
* - First exchange after 5 hours, than after 100 to 130 hours (in dependence on oil grade)
** - Oil replacement intervals see Operating manual for engine
*** - In case of damage (even during cutting)) – crack, bend, breakage, etc..- repair
required without a delay!
**** - or replacement after about 100 hours.
6.8 Washing and cleaning the machine.
,Cleaning and washing the machine, proceed to observe valid regulations and
legislation on the protection of water courses and other water resources against
pollution or contamination with chemical substances.
,Never wash the engine with a stream of water! Electric equipment might fail when
starting the engine.
All dirt, debris and plant residues should be removed from the machine after the end of
the season. Check the intactness of working blades, sharpen cutting edges (or replace the
blades if necessary) and conserve the blades with conservation oil. Travel wheels should be
dismounted from the axle once in a season, cleaned and the hubs inside filled with a new
filling of plastic lubricant.
,The engine must be switched off and the cable termination to the spark plug
disconnected!
Procedure of wheel disassembly, lubrication and re-assembly:
a) Underlay the machine so that the wheels can freely turn. The machine must be secured
against spontaneous motion.
b) Take out the split pin and screw the slotted nut out by using spanner No. 24. Remove the
wheel from the axis.