Verine VLF45NG Installation, User And Servicing Instructions - page 10
10
C
OMMISSIONING
When commissioning your appliance, remove the cap from the isolator fitting and
unscrew the plug all the way out. Replace the cap making sure that the tab engages
with the slot in the top of the plug. Tighten cap securely. Light the appliance in
accordance with the instructions relevant to the appropriate control. (See following
sections for details)
CHECK FOR SPILLAGE
1
Before briefing the customer on how to use the appliance, a spillage test must be
carried out with the appliance and decorative fret in position. The following
procedure must be followed.
2
Close all doors and windows in the room or space containing the appliance.
3
Light a smoke match and pass completely along the front edge (and just inside the
top edge) of the fireplace or firebox. A visual check should ascertain that all the
smoke generated is drawn back into the firebox.
4
If there is evidence of spillage, the flue should be heated for a period of 5 to 10
minutes and the test repeated.
BRIEFING THE USER
1
Demonstrate the full operation of the appliance to the customer, referring them
specifically to the lay of the logs and the removal of soot, as described in these
instructions.
2
Inform the customer that all cleaning procedures should be carried out only when the
appliance is cold.
3
Leave these instructions with the customer.
4
Advise the importance of having the appliance serviced and the chimney checked for
clearance of combustion products on an annual basis.