VOKERA Eclipse 216 ESS Installation & Servicing Instructions Manual - page 9
Supplied By www.heating spares.co Tel. 0161 620 6677
7
SECTION 4
INSTALLATION
4.1
DELIVERY
The appliance is delivered in a heavy-duty card-
board carton. Lay the carton on the floor with the
writing the correct way up.
4.2
CONTENTS
Contained within the carton is:
●
the boiler;
●
the wall mounting bracket;
●
template;
●
an accessories pack containing the appliance
service valves and washers;
●
the instruction pack containing the installation
& servicing instructions, user instructions,
Benchmark logbook, guarantee registration
card, and a 3amp fuse.
4.3
UNPACKING
At the top of the carton pull both sides open – do
not use a knife – unfold the rest of the carton from
around the appliance, carefully remove all pro-
tective packaging from the appliance, and lay the
accessories etc. to one side.
4.4
PREPARATION FOR MOUNTING THE
APPLIANCE
The appliance should be mounted on a smooth,
vertical, non-combustible surface, which must be
capable of supporting the full weight of the
appliance. Care should be exercised when
determining the position of the appliance with
respect to hidden obstructions such as pipes,
cables, etc.
When the position of the appliance has been
decided – using the template supplied – carefully
mark the position of the wall-mounting bracket
(see fig. 6) and flue-hole (if applicable).
4.5
FITTING THE FLUE
The top flue outlet permits both horizontal and
vertical flue applications to be considered,
alternatively, the Vokera twin flue system can be
utilised if longer flue runs are required.
4.5.1
CONCENTRIC HORIZONTAL FLUE
(For concentric vertical flue, see 4.5.2).
(For twin flue applications, see 4.5.3).
The appliance flue outlet elbow can be rotated
through 360
°
on its vertical axis. In addition the
flue may be extended from the outlet elbow in the
horizontal plane (see 2.8). A reduction must also
be made to the maximum length (see table below)
when additional bends are used.
Using the template provided (see fig. 6), mark
and drill a 125mm hole for the passage of the
flue pipe. The hole should have a 1
°
rise from the
boiler to outside.
The fixing holes for the wall-mounting bracket
should now be drilled and plugged, an
appropriate type and quantity of fixing should be
used to ensure that the bracket is mounted
securely. Once the bracket has been secured to
the wall, mount the appliance onto the bracket.
FITTING THE HORIZONTAL FLUE KIT
Take the large black gasket - supplied with the
flue terminal kit - and stretch it over the appliance
flue outlet (fig. 7). Using a twisting motion, connect
the boiler top adaptor - supplied with the flue
terminal kit - to the appliance flue outlet ensuring
the male spigot of the adaptor is pushed fully into
the flue outlet spigot of the boiler (fig. 7). Carefully
measure the distance from the centre of the
appliance flue outlet to the edge of the finished
outside wall (dimension X). Add 45mm to
dimension X to give you Dimension Y (see fig
7A). Measure dimension Y from the terminal end
of the concentric flue pipe and cut off the excess.
Pass the concentric flue pipe through the
previously drilled hole. Fit the flue bend to the
boiler top adaptor and insert the concentric flue
pipe into the flue bend ensuring the correct seal
is made.
Reduction for additional bends
Bend
Reduction in maximum flue length for each bend
45
°
bend
90
°
bend
0,5 metre
1,0 metre
Horizontal flue terminals and accessories
Part No.
Description
Min-Max length
0225720
0225755
0225740
0225745
0225750
0225730
0225735
0225760
Horizontal flue kit for use with
add. bends & extensions
350-500 Telescopic extension
0,5m extension
1,0m extension
2,0m extension
45
°
bend (pair)
90
°
bend
Wall bracket (5)
1000mm
350mm-500mm
500mm
1000mm
2000mm
N/A
N/A
N/A
Fig. 7
Black
gasket
Boiler
Flue outlet
Boiler top
adaptor