DL manuals Wacker Neuson Power Tool BH 65 Operator's Manual Wacker Neuson BH 65 Operator's Manual - page 34 Other manuals for BH 65: Operator's Manual Manual is about: Gasoline demolition hammer 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768 Page of 68 Go Download Print this page Bookmark us 10 Use and operation 34 10.4.1 Starting the engine Note: When starting the engine, move to a position at least 3 m (9.8 ft) from the fueling area. Item Designation Item Designation 1 Fuel tap 4 Throttle lever 2 Fuel pump 5 Choke 3 Starter rope « ‹ Prev31323334353637Next › »