Wacker Neuson FUE 6 Operator's Manual - Operation
20
Operation
FUE 6
7
Operation
7.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Plug
The machine comes with a country-specific plug as a standard equipment.
Checking the machine
f Check the machine and all components for damages.
Checking the mains
f Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter Technical Data).
f Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
Connecting internal or external vibrators
Applicable to inverters with frequency adjustment:
f During the operation of internal vibrators, set the thumbwheel to the maxi-
mum output frequency (highest number must be visible).
f During operation of external vibrators, use the thumbwheel to search the re-
quired output frequency.
The output frequency affects the speed of the connected machines.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety information.
0212683