Washtech CD 260 Operator's Manual - page 6
Installation & Maintenance Checklist
CHECK
OK / NOTES
MAINTENANCE ITEM
Delivery
Supplied complete
no transit damage
Position
Level and stable
on sound, waterproof, self draining floor
Benchwork
secure with smooth rack path in and out
Water
Isolator valve fitted
accessible, all fittings sound, no leaks
DCVs fitted
correct direction
Supply Temperature
65 ± 5°C
Flow rate
minimum 15 litres per minute
Pressure
200-350kpa, limiter fitted if above this
range, booster fitted if below this range
Cold water if required
pressure not above 350 kpa
Hardness
filter or softening if required,
excessive hardness or chlorides can
damage
Power
Isolating switch
fitted, functional and accessible
Supply as specified
voltage, current, circuit breaker
Waste
Connections 40 mm
sound, no leaks
Waste line 50mm
Ventilation
Appropriate/not excessive
refer separate section in manual,
curtains fitted correctly
Commissioning
Commissioning switch
break seal and turn on (if fitted)
Pump Rotation
CONFIRM CORRECT DIRECTION
as shown by arrow on pump
if necessary rotate supply phases
Chemicals – chemicals and chemical injectors to be supplied and adjusted by professional supplier
Product
n m
container
no leaks
primed
concentration
Detergent
Rinse Aid