Water Tec CP Operating Manual - General System Diagram (X)
Water Tec Int’l. Inc. Version 02A
15
containing two membranes per
housing.
7. Powder Coated Steel Frame
GENERAL SYSTEM DIAGRAM (X)
1. Incoming feed water
2. Pre-Filter 1 and 2
3. Inlet Ball Valve
4. Pump A
5. Pump B (standard equipment has 1 pump)
6. Pump C (cleaning pump) OPTIONAL
7. Control Box
7a. Pump “A” Hour Meter (option)
7b. Pump “B” Hour Meter (option)
7c. Pump “C” Hour Meter (option)
7d. Permeate/Concentrate Flow Meter
7e. Recycle Flow Meter
7f. Power Light
7g. Low Pressure
7h. Over Pressure
7i. Fast Flush
7j. Cleaning (option)
7k. Power Switch
7l. Clean/Auto run Keyed Switch
8. Control Panel
8a. Pre Filter Gauge
8b. Post Filter Gauge
8c. Pump “A” Pressure Gauge
8d. Pump “B” Pressure Gauge
8e. Inter Mediate Membrane Pressure
Gauge
8f. Post Membrane Pressure Gauge
9. Recirculation Valve
10. Concentrate Valve
11. Fast Flush Ball Valve (OPTIONAL)
12. Chemical Tank (OPTIONAL)
13. Module – Membranes and Housing
14. Powder Coated Steel Frame
1
2
3
4
5
6
7
7a
7b
7c
7d
7e
7f 7g 7h 7i 7j
7k
7l
8
8a
8b 8c 8d 8e 8f
9 10
11
12
13
14
* Equipment Pictured Shows Many Options Available