Xpelair Xpelair C100T Installation And Maintenance Instructions Manual

Summary of Xpelair C100T

  • Page 1

    [1] installation and maintenance instructions xpelair c100p pull cord xpelair c100t timer xpelair c100ht humidistat, timer and pull cord contour range of toilet / bathroom fans with ac motors.

  • Page 2

    [2] b c a d.

  • Page 3

    [3] f e.

  • Page 4: By Children.

    [4] xpelair c100p / c100t / c100ht contour range of toilet / bathroom fans installation and operating instructions. Please leave this leaflet with the fan for the benefit of the user. Important customer information this appliance can be used by children aged from 8 years and above and persons with r...

  • Page 5

    [5] what the installer will need. If metal switch boxes are used, earthing regulations must be followed. Suitably rated 2-core cable – c100p. Suitably rated 3-core cable – c100t / c100ht. 3mm electrician’s screwdriver and no.1 or 2 pozidrive screwdrivers. A wall or ceiling on/off switch – c100t / c1...

  • Page 6

    [6] preparing the hole. If working above ground floor level, safety precautions must be observed. Warning: eye protection must be worn during all drilling and chiselling operations. If installing in a wall. 1. Check there are no buried pipes or cables in the wall or obstructions on the outside e.G. ...

  • Page 7

    [7] setting the fan. C100t only. To adjust the over-run period turn the control (t) clockwise to increase and anti-clockwise to decrease – see figure f. C100ht only – see figures e and f. The pre-set humidity operation is factory set at approximately 75% relative humidity (rh), but can be adjusted b...

  • Page 8

    [8] do’s and don’ts d o read the entire instruction leaflet before commencing installation. Do install each fan with a means for disconnection in all poles in the fixed wiring. Do make sure the mains supply is switched off before attempting to make electrical connections or carry out any maintenance...