Zehnder Rittling FV-04 Installation, operation and maintenance manual

Manual is about: Rittling Fanvector

Summary of FV-04

  • Page 1

    I cooling fresh air clean air heating rittling fanvector installation, operation and maintenance.

  • Page 2

    Arrangements 1 general information 1 dimensions and data 2 installation 6 wiring diagram 9 operation 10 maintenance 11 service parts 11 warranty 12 important: submittal documentation, specific to each project, supersedes the general guidelines contained within this manual..

  • Page 3

    1 arrangements general data unlike natural convective products, the rittling fanvector has an increased air capacity due to the addition of a tangential blower that pushes a higher volume of air across the heat transfer surface. The benefit of this technology is that less linear footage of heating p...

  • Page 4

    2 iso view back view mounting location side view less end panel electrical access door with 1/4 turn fastener 5" x 5" 2-7/8" 4-1/2" 1-3/8" front view with front panel front view less front panel bottom view bottom view alternate view, same end connection 7-1/2" 47-15/16" 1-31/32" 2-25/32" 1/2" coppe...

  • Page 5

    3 dimensions and data model fv-06 iso view back view mounting location side view less end panel electrical access door with 1/4 turn fastener 5" x 5" 2-7/8" 4-1/2" 1-3/8" front view with front panel front view less front panel bottom view bottom view alternate view, same end connection 7-1/2" 71-15/...

  • Page 6

    4 dimensions and data model fv-08 iso view back view mounting location side view less end panel electrical access door with 1/4 turn fastener 5" x 5" 1/4-20 pph fastener 2-7/8" 4-1/2" 1-3/8" front view with front panel front view less front panel bottom view 7-1/2" 89-7/16" 4-7/32" 81-1/2" 7/8" fan ...

  • Page 7

    5 dimensions and data recessed floor 12.140 4.368 5.688 5.500 sectional view heavy-duty grille (by others) adjustable leveling legs (6) (2" range of adjustability) trench vector coil recessed floor box iso view length is determined by number of blowers (see chart) top view (shown less grille) blower...

  • Page 8

    6 installation inspection upon receipt of the equipment, carefully check the shipment against the bill of lading. Make sure all units have been received. Inspect the packaging of each unit, and inspect each unit for damage. Ensure that the carrier makes proper notation of any shortages or damage on ...

  • Page 9

    7 installation installation preparation ■ ■ verify that electrical power is disconnected prior to installation and service. ■ ■ ensure that field plumbing and electrical meets applicable national and local codes and requirements. ■ ■ the rittling fanvector cabinet has keyhole slots included in the b...

  • Page 10

    8 installation plumbing ■ ■ the rittling fanvector is supplied with either opposite end, same end or recessed floor connections. Opposite end connections have brass headers with a 3/4" fpt connection. The headers have a 1/4" fpt hole that can be plugged or fitted with a vent (by others). Same end co...

  • Page 11

    9 wiring diagram on/off switch 120 vac l1 hot (black) l2 neutral (white) black white blower motor variable speed control white black white white black blower motor white black blower motor white black blower motor white black wire termination factory wire, not connected wire connection factory wired...

  • Page 12

    10 initial start-up ■ ■ verify that all isolation valves are open and control valves (if any) are wired. ■ ■ verify that all air has been removed from the hot water system and there is no air trapped in the coil. ■ ■ verify that voltage is within an acceptable range and that fuses and breakers are p...

  • Page 13

    11 installation maintenance service parts motor blower assembly ■ ■ the blower motor assembly is assembled with long-life, maintenance-free bearings. There is no need for lubrication of the assembly. ■ ■ periodic cleaning of the fan and motor can be accomplished best with a vacuum with a soft brush ...

  • Page 14

    Zehnder rittling guarantees its products to be free from defects in material and workmanship for a period of two years from date of shipment from our factory. Should there be any defects in the good(s), the purchaser should promptly notify zehnder rittlng. Upon receipt of written consent from zehnde...

  • Page 16

    Zehnder rittling · 100 rittling boulevard · buffalo, ny usa 14220 t 716-827-6510 · f 716-827-6523 · sales@zehnder-rittling.Com www.Zehnder-rittling.Com © zehnder rittling august 2014, english, subject to change without notice.