4. Specifications
Rated
capacities.....................................100 kN, 200 kN, 300 kN
Rated
output...........................................2mV/V±0.1%
Maximum safe overload .........................200%R.C.
Combined
error ......................................±0.016%R.O.
Zero
balance ..........................................±1%R.O.
Compensated
temperature range...........-20
°C ~ 60°C
Minimum
excitation voltage ....................5VDC
Recommended excitation voltage ..........5 ~ 12VDC
Maximum
excitation voltage ...................15VDC
Input
terminal resistance ........................800
Ω±80 Ω
Output
terminal resistance......................2200
Ω±10 Ω
Insulation
resistance...............................Greater than 5000M
Ω at DC50V
Temperature
effect - Zero.......................0.019%R.O./10
°C Typ.
Temperature
effect - Span......................0.010%R.O./10
°C Typ.
Cable
diameter/ length ...........................
φ8/ 12m
Dustproof/Waterproof .............................IP68 (100h at 1.5m immersion)
Cable connection color
Red................................................Excitation + (Input)
White .............................................Excitation - (Input)
Green ............................................Signal + (Output)
Blue ...............................................Signal - (Output)
Yellow............................................Shield
5. Installation
This section describes the installation of "the type with pre-installed accessories" as
standard type. Refer the following procedure to install "the type without accessories".
Caution Consider the installation and weighing system design to use the LCC11 series,
because it is very sensitive and high response.
Concerning "the type with pre-installed accessories", remove the support
pillar before loading anything on it.
Step 1 Design the layout of the load cell cable.
Remove the upper socket and rotate the load cell to arrange the direction of the load
cell cable before installation.
Bearing plate
Support pillar
Load cell
Mounting plate
Support pillar
Upper socket
Lift up
Lift the upper socket and
arrange the direction of
the load cell cable before
installation.
It is available to remove
the load cell from both
plates.