Bacchus BCS2000 Installation Manual - page 2
5. Repeat the same procedure from the 5/8” suction line of the condensing unit. Solder
to a 5/8”
run of a 5/8” x ½” x ½” tee. Run ½” copper to the suction line connections in each
evaporator.
6. Power from disconnect (recommended) 12-2/with ground to the condensing unit.
7. Check low pressure control for the correct 25 psi setting, with a 15 psi differential.
Diagram 1
Evaporator Set Up
1. Locate a suitable ceiling mount location, and space both evaporators equally across
the
ceiling. Allow for at least 24 inches from the back of the evaporator (coil side) to
the back wall for adequate
air distribution.
2. Run the 1/4” drain line from the pump in the evaporator through the ceiling cap and
out to a
suitable location. Heat tape any portion susceptible to freezing..
3. Attach template to the ceiling. Remove the stainless steel outer enclosure from the
base of
the unit. Attempt to locate any mounting holes below ceiling joists for secure
attachment with (#8) wood screws.
Use moly bolts for all other mounting locations.
Attach base securely to the ceiling. (diagram 1) Minimum 7 mounts.
4. Below is the BCS electronic control package used in both the BCS2000 and
BCS3000 System. The main control module below must be mounted equidistantly
between both evaporators in a serviceable location.
Master Control Module
2