Summary of G1

  • Page 1

    G1,g2 & g3 installation & operating guide bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the operating manual, or to view the illustrated parts catalog, programming manual, or service ...

  • Page 2

    2 10191 012609 bunn-o-matic commercial product warranty bunn-o-matic corp. (“bunn”) warrants equipment manufactured by it as follows: 1) all equipment other than as specified below: 2 years parts and 1 year labor. 2) electronic circuit and/or control boards: parts and labor for 3 years. 3) compresso...

  • Page 3: Please Close Lid

    3 special r eg ul ar el ec p er c automat ic drip fine es pr es so turkish turkish co ar se r eg ul ar e lec per k drip auto-drip f ine es pr es so 20545-0000d 01/04 © 1990 bunn-o-matic corporation read the entire operating manual including the limit of warranty and liability before buying or using ...

  • Page 4

    4 10191 062309 initial set-up caution - unplug the grinder throughout the initial set-up. 1. Open the top lid. Clear all foreign objects and shipping materials from the hopper compartment and the entrance to the grind chamber. 2. Tip the machine gently, on its back, so it rests with approximately on...

  • Page 5

    5 10191 113007 cleaning warning - unplug the grinder before the removal of any panel or grind chamber-housing parts. 1. Clean all exterior surfaces using a damp cloth rinsed in any mild, nonabrasive, liquid detergent. Care should be taken not to scratch the grinder with any abrasive material. 2. Emp...

  • Page 6

    6 coffee grinding 1. Turn the selector knob to align the red arrow with the desired grind. 2. Raise the top lid and add the whole bean coffee. Close the top lid. 3. Locate the back of a bag behind the dispense chute. (the grinder will not operate unless the bag is behind the chute.) 4. Allow the bag...