CAME A 3024 N Installation Manual - page 10
10
ENGLISH
Th
e data and inf
or
m
atio
n s
hown in this manual ma
y be changed b
y
C
A
M
E cancelli automatici s.p
.a
. at an
y time w
itho
ut pr
io
r war
ni
ng.
8 Maintenance
8.3 Extra-ordinary maintenance
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specia-
lised firms.
N.B.: Any extraordinary maintenance must be performed by specialised technicians.
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
Extra-ordinary maintenance log
Date
Notes
Signature
Periodic maintenance log for end-user (every 6 moths)