D-Link DES-1250G Quick Installation Manual - Setup The Des-1250G Switch
2
Setup The DES-1250G Switch
The setup of the Switch can be performed using the following steps:
A.
Install the DES-1250G in a fairly cool and dry place. See the
Technical Specifications for the acceptable operation temperature
and humidity ranges.
B.
Install the DES-1250G in a site free from strong electromagnetic
field generators (such as motors), vibration, dust, and direct
exposure to sunlight.
C.
Leave at least 10cm (about 4 inches) of space at the front and rear
of the hub for ventilation.
D.
Visually inspect the DC power jack and make sure that it is fully
secured to the power adapter.
E.
Install the DES-1250G on a sturdy, level surface that can support
its weight, or in an EIA standard-size equipment rack.
F.
When installing the Switch on a level surface, attach the rubber feet
to the bottom of each device. The rubber feet cushion the hub and
protect the hub case from scratching.
Attach the adhesive rubber pads to the bottom
Rack Mounting
The DES-1250G can be mounted in an EIA standard-size, 19-inch rack,
which can be placed in a wiring closet with other equipment. Attach the
mounting brackets to both sides of the Switch (one at each side), and
secure them with the provided screws.
Use the screws provided. Then, use screws provided with the
equipment rack to mount the Switch in the rack.