East EA610 User manual - page 7
-10-
Fig. 2.4.3 Installation of rack parts
When the rack parts have been installed, fasten UPS to the rack (as shown below).
Fig. 2.4.3 Rack installation
Screws
Rack foot pieces
-11-
3. Function Setting of Panel Keys and Description of
LCD Display
3.1 Description of panel keys
Description of rack panel keys Description of tower panel keys
Key combination
Function introduction
Press the two keys for 3 seconds to start up.
1)
Press the two keys for 3 seconds to shut down.
2)
Press the setting interface for 5 seconds to restore factory
settings and exit the setting interface.
1)
Press “
” momentarily to enable inverter mute.
2)
In the utility power mode, press “
” momentarily to
enable the battery discharge testing for 15 seconds.
1)
Press the key for 5 seconds to enter the setting interface.
2)
Press the key momentarily in the setting interface to turn the
page.
3)
Press the key for 3 seconds to exit the setting interface
without saving data.
4)
Select the item to be set in the setting interface. After
selecting the required setting, page down to “save and exit”
page. Choose “Yes”, press “
” momentarily to save the
date and exit the setting mode.
5)
In non-setting mode, momentarily press the key twice, and
the LCD display content rotates.
6)
In setting mode, when it goes to SAVE page, press “
” or
“
” momentarily, choose “Yes”, press “
” to complete the
setting and exit the mode.