Economix Zlin Z-526 AFS Instruction Manual - page 4
31
TP Screw (2.3x12mm)
Screw (4x20mm)
Screw (4x35mm)
Screw (2x10mm)
Screw (3x16mm)
2
2
2
Collar (2mm)
5
Collar (3mm)
2
Collar (5mm)
2
6
6
6
Nut(2mm )
Nut(3mm )
6
Washer(2x6mm)
Washer(3x6mm)
Washer(4x8mm)
Washer(6x12mm)
6
2
2
1
1
12
2
1
1
4
4
Screw (6x35mm)
2
2
4
Blind Nut(4mm)
Wheel(100mm)
Wheel(45mm)
Rod (2.5x300mm)
2
Rod (2x300mm)
Control horn
4
Control horn
Linkage Stopper
Landing gear straps
Landing gear
Landing gear
Wooden supporter
Clevis(3mm)
6
Clevis(2mm)
Plastic tube (2x400mm)
Fuel tank (550cc)
Rod (2x200mm)
2
4
2
1
2
Cable tie
2
Steelwire
(0.5x3000mm)
4
Copper joiner
1
Aluminium plate
4
Aluminium tube
1
1
Wing joiner(27x700mm)
Stabilizer joiner(12x297mm)
Zlin Z-526 AFS packing list
Package1
Package4
Packaeg5
Package2
Package3
2
Linkage Stopper
Washer (2mm)
Washer (2mm)
Nut (2mm)
Set screw (3x4mm)
Washer (2mm)
Set screw (3x4mm)
1
1
1
1
The sketch map when the engine install completion.
Install the servo of the throttle.
Assemble the servo of the throttle in the fuselage.
Fuel supply line
Fuel spray line
Air pressure line
Assembly of the fuel tank.
Fix the fuel tank to appropriate position in the fuselage
with cable tie.
cable tie
cable tie
cable tie
2
Set Screw (3x4mm)
Set Screw (2mm)
Rod (2x200mm)
Set Screw (2mm)
Washer (2mm)
Linkage Stopper
1
1
1
1
1
4
4
Washer (4x8mm)
4
Rod (2x200mm)
Blind Nut (5mm)
Screw (4x25mm)
Set Screw (3x4mm)
Assemble the throttle linkage.
39
38
43
41
42
11
40