EZ Breathe 400 Installation Manual

Manual is about: ventilation unit

Summary of 400

  • Page 1

    Installation guide corporate office: 349 highland road east macedonia, ohio 44056 1 . 8 6 6 . 8 2 2 . 7 3 2 8 w w w. E z b r e a t h e . C o m copyright 2006, ez breathe, llc model #400

  • Page 2: What’S Inside

    Before installing your ez breathe ventilation unit, make sure that you have the right model and accessories. Make sure that the total length of the unit is taller than your foundation wall. The following items should be included in the box. If parts are missing, contact our customer service at 1.866...

  • Page 3: Parts Of Ez Breathe

    Parts of ez breathe 3.

  • Page 4: 1.  Location Selection

    1. Location selection 4 ez breathe location. The installation must be performed in the basement or lowest, wettest, coldest level of your home/building. Please find an outside wall to accommodate a 6" exit hole to the exterior of the house where no electrical wires or pipes are present. Also, make s...

  • Page 5: 2. Drill The Duct Hole

    2. Drill the duct hole 3. Putting it together 1. From the inside, drill a pilot hole approximately ¼” at the center of the proposed hole. Note: you may have to make inside and outside measurements to ensure accurate duct hole location. 2. Outside the home/building, find your pilot hole. Using a hole...

  • Page 6: 4. Attach Flex, Pipe & Vent

    4. Attach flex, pipe & vent 6 5. Secure outside vent 6. Fasten unit to the wall from the inside, slide the beaded end of the pipe through the 6" outside hole so that it sticks out a couple of inches. Once this is done slide the flex onto the pipe. Stretch the flex and cut the excess off; if this is ...

  • Page 7: 7. Set Humidistat

    7. Set humidistat 7 8. Set speed control plugging it in this component continuously monitors the humidity level of the air being expelled through the ez breathe unit. You can set this control to maintain the desirable level of humidity in your home/building. For best results… set the humidistat betw...

  • Page 8: Letter Sweepstakes

    Drop ceilings - “l” piece letter sweepstakes 8 1. With removable panels: a. Move a panel to see where pilot hole in face plate will be drilled. Drill pilot hole. B. Drill exhaust hole same directions as above. C. Take screws out of top piece (top chute) and insert “l” piece. Attach it with 4 white s...

  • Page 9: Finished Wall - Z Piece

    9 finished wall - z piece crawl space installation for finished basements the “z” piece is used to move the base of the ez breathe unit away from the wall. Because the chute is 14" wide and 2" deep it can be placed between studs and finished over, making the finished space more usable and improve th...

  • Page 10: Please Remember!

    10 please remember! Z do not store anything within a radius of 3 to 4 feet around the base of the ez breathe ventilation unit. These articles will interfere with the circulation at floor level. Z make sure that the air from the entire home/building can reach the ez breathe ventilation unit. Z keep d...