Faber Duet Installation Manual - page 13
>
>
>
>
12
UK
IRL
4 Instruction for Installation
4.1 Gas Connection
• Installation pipes should be in accordance with BS 6891. Pipe work from the meter
to the appliance must be of adequate size.
• The complete installation including the meter must be tested for soundness and
purged as described in the above code.
• A means of isolation must be provide in the supply to facilitate servicing. The
connection should be made in 8 mm copper or similar semi flexible tube. (max 1
meter). Ensure that the gas pipe does not interfere with the removal or
replacement of the burner tray or of the controls. The gas connection is nut and
olive suitable for 8 mm pipe.
4.2 Electrical connection
If the adapter is used a wall socket 230VAC – 50Hz must be mounted in the close
neighbourhood of the hearth.
4.3 Preparation of the appliance
• Remove the appliance from the crate and the pallet. Make sure you don’t damage
the flexible gas pipes.
• Remove the glass and take out the separately wrapped parts of the appliance! (see
par.4.3.1.)
4.4 Removing the glass
• Clear out a safe place to put down the glass.
• Remove the bottom sealing ledge. (see fig. 3.2 and 3.3)
• Place the suction cups on the front glass. (see fig. 3.4)
• Remove the top and bottom sealing cord on the front. (see fig. 3.5)
• Gently push the glass upwards so that the bottom is free of the groove and now
gradually tilt the glass forwards and downwards. (see fig. 3.6 and 3.7)
• Remove the bottom grate. (see fig. 3.8)
• Remove the sealing strip (depending on the version the strip is situated at the left
or at the right; see fig. 3.9)
• Place a suction cup on the side glass. (see fig. 4.0 )
• Remove the sealing cord. strip (depending on the version the strip is situated at the
left or at the right; see fig. 4.1)