Fanaway EVO1 - PREVAIL Installation Instructions Manual - page 4
4
INSTALLING THE BLADES
14.
The blades (No.8– Fig. 3) are already installed and balanced in the unit by the
manufacturer and do not need to be tampered with.
INSTALLING THE DOWN ROD
15.
Feed down rod through ceiling canopy (No.3– Fig. 3) and bolt and pin cover (No.15–
Fig. 3),insert the motor wires through down rod, insert down rod (No.4– Fig. 3) to the
top of the unit (No.7– Fig. 3), line up unit holes with down rod holes and insert bolt
(No.5– Fig. 3). Then insert pin (No.6– Fig. 3) to end of bolt. Finally secure down rod
and hanger via tightening two screws on the hanger.
INSTALLING THE FAN TO MOUNTING BRACKET ON CEILING
16.
If the optional remote kit is not used, lift the fan to the ceiling and seat the ball joint in
mounting bracket socket, make sure the tab on the mounting bracket socket is
properly seated in the groove in the ball joint.
17.
Plug the plugs and sockets together then slide the ceiling canopy (No.3– Fig. 3) onto
the mounting bracket using the slotted holes. Align the other 2 holes and then install
the 2 other screws.
Tighten all four screws firmly.
18.
Install light kit and screw light base firmly to the fan. Do not over-tighten.
THE FAN IS NOW READY FOR USE
19.
HOW TO USE THE FAN/LIGHT
I. Select the desired speed on the wall control (see Fig.2) by turning the knob to: “1”...
“2” ... “3”…
II. Use the light switch to turn the light On or Off.
Figure 2
9